New build
27 Jul 2023 · Latest notice
2 notices · phased
Dublin 4, Dublin · Dublin City Council · Planning ref SHD0012/20 (ABP-307267-20)
Consists of four residential blocks over a shared basement. The project involves the construction of a twelve storey building. The building consists of residential accommodation at all upper levels and a number of amenity/ancillary areas at Basement level, Ground level and 7th level including a resident’s lounge, storage areas and substation. The building consists of Block A (A1, A2 & A3), which is mostly residential apartments and amenities linked to Block B (a block of 9 duplex dwellings) via a balcony approach from Stair core 3. Block A1, A2, A3 and B will each be served by a single stair core (Stair 1, 2 and 3 respectively). All ground floor apartments, and Duplex 1 – 6 in Block A, have independent exits leading directly to the external. Duplex 7 – 9 connects to stair core 3 via balcony approach. The proposed building will consist of 148 units from ground floor to 11th floor.
Notice-stated scale
148 units · 10,027.8 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0103599DC BCMS open-data feed
Fit out of Tenant Amenity Areas to Ground Floor and 7th Floor at Eglinton Place Dublin 4. Works include installation of internal partitions, wall linings, ceilings, internal joinery & sanitary ware, all finishes and services associated with the areas, life safety systems are connected to & associated with overall building installation.
561.3 m²Builder not named
27 Jul 2023
SN0006311DC BCMS open-data feed
Consists of four residential blocks over a shared basement. The project involves the construction of a twelve storey building. The building consists of residential accommodation at all upper levels and a number of amenity/ancillary areas at Basement level, Ground level and 7th level including a resident’s lounge, storage areas and substation. The building consists of Block A (A1, A2 & A3), which is mostly residential apartments and amenities linked to Block B (a block of 9 duplex dwellings) via a balcony approach from Stair core 3. Block A1, A2, A3 and B will each be served by a single stair core (Stair 1, 2 and 3 respectively). All ground floor apartments, and Duplex 1 – 6 in Block A, have independent exits leading directly to the external. Duplex 7 – 9 connects to stair core 3 via balcony approach. The proposed building will consist of 148 units from ground floor to 11th floor.
148 units · 10,027.8 m²Builder not named
16 Jul 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Jun 2023 · Latest notice
2 notices · phased
Whitebrook, Wexford · Wexford County Council · Planning ref WCC Part 8
Contract of 22 No. dwellings comprising 14No. 3 Bedroom Dwellings, 4No. 4 Bedroom Dwellings & 4No. 2 Bedroom Apartment Dwellings and associated Siteworks.
Notice identity Works stated Scale Commenced
CN0102826WX BCMS owner-supplied export
Contract of 22 No. dwellings comprising 14No. 3 Bedroom Dwellings, 4No. 4 Bedroom Dwellings & 4No. 2 Bedroom Apartment Dwellings and associated Siteworks.
44 units · 2,260 m²Builder named
30 Jun 2023
CN0086667WX BCMS owner-supplied export
Single-party Framework Agreement for Construction of 44 no. residential dwellings at Whiterock Hill, Wexford - Initial Contract of 22 No. dwellings
44 units · 1,739 m²Builder named
02 Mar 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 Jun 2023 · Latest notice
2 notices · phased
Rosslare, Wexford · Wexford County Council · Planning ref LAC1909
Construction of 23 no. social housing units (Phase 1) and all ancillary site development works at Rosetown, Rosslare, Co. Wexford.
Notice identity Works stated Scale Commenced
CN0102395WX BCMS owner-supplied export
Proposed Construction of 12 No. Houses at Rosetown, Rosslare, Co. Wexford.
12 units · 965.9 m²Builder named
22 Jun 2023
CN0075706WX BCMS owner-supplied export
Construction of 23 no. social housing units (Phase 1) and all ancillary site development works at Rosetown, Rosslare, Co. Wexford.
23 units · 2,342.5 m²Builder named
10 May 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
15 Jun 2023 · Latest notice
3 notices · phased
Blackrock, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP-311190-21
This 7-Day Notice relates to the proposed development at Cross Avenue, Blackrock, comprising of the construction of a Build-to-Rent Apartment Development consisting of 3no. blocks ranging in height up to nine storeys, with one level of basement. 241no. apartments are proposed, comprising 18no. studios, 120no. one-beds, 99no. two-beds and 4no. three-beds. All residential units are provided with associated private balconies and terraces to the north, south, east and west elevations. The development will also include resident support facilities and resident services and amenities, inter alia, lobby and café, concierge, management, co-working area, meeting areas, multipurpose areas, relaxation and sitting area, fitness area, and residents lounge and private dining. Provision of 71no. car parking spaces in the basement and one set down area at surface level; 479no. bicycle parking spaces; and 10no. motorcycle spaces. Vehicular, pedestrian and cyclist access is directly from Cross Avenue. The intention is to complete the works in the entirety, but phased completion may be required on a “per block” basis. This notice follows on from the works completed by the basement / concrete contractor under previously submitted Commencement Notice CN0097881DR, and includes all remaining works to the partially completed basement and ground floor / podium level structures.
Notice identity Works stated Scale Commenced
SN0008560DR BCMS open-data feed
This 7-Day Notice relates to the proposed development at Cross Avenue, Blackrock, comprising of the construction of a Build-to-Rent Apartment Development consisting of 3no. blocks ranging in height up to nine storeys, with one level of basement. 241no. apartments are proposed, comprising 18no. studios, 120no. one-beds, 99no. two-beds and 4no. three-beds. All residential units are provided with associated private balconies and terraces to the north, south, east and west elevations. The development will also include resident support facilities and resident services and amenities, inter alia, lobby and café, concierge, management, co-working area, meeting areas, multipurpose areas, relaxation and sitting area, fitness area, and residents lounge and private dining. Provision of 71no. car parking spaces in the basement and one set down area at surface level; 479no. bicycle parking spaces; and 10no. motorcycle spaces. Vehicular, pedestrian and cyclist access is directly from Cross Avenue. The intention is to complete the works in the entirety, but phased completion may be required on a “per block” basis. This notice follows on from the works completed by the basement / concrete contractor under previously submitted Commencement Notice CN0097881DR, and includes all remaining works to the partially completed basement and ground floor / podium level structures.
241 units · 21,988 m²Builder not named
15 Jun 2023
CN0097881DR BCMS open-data feed
This Commencement Notice relates to the Basement Box Works at Cross Avenue, Blackrock, and includes works associated with Basement Level -1, and the Ground Floor / Podium slabs only. This will consist of the partially completed basement structures; construction of a single level basement comprising a total of c.3,338 sq.m gross floor area below ground level, with a segregated ramp for vehicular and bicycle access, along with podium level slab at ground floor level relating to Blocks A, B & C, including all starter bars to the underside of the 1st floor slabs, all associated site retaining walls, and below ground site services and ducts. Note: All works above podium level will be subject to a separate commencement notice. The builder is to be changed as the project progresses, and a main contractor will be brought on board to take over works being completed by the basement / concrete contractor.
3,888 m²Builder not named
22 Feb 2023
CN0089041DR BCMS owner-supplied export
The Demolition and Enabling Works at Cross Avenue, Blackrock, associated with this Commencement Notice, include: the demolition and removal of existing structures (being Clareville and Tower Green); the removal of all hard standings, roads and pathways to the site area; the demolition and removal of sections of the existing boundary wall to Cross Avenue; decommissioning and rerouting of existing underground services; the removal of trees and hedging (as outlined in the Planning Documents); part excavation of the basement to formation level; and all temporary contractor site hoardings and gates.
Scale not statedBuilder named
10 May 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
06 Jun 2023 · Latest notice
2 notices · phased
Ballynacorra, Midleton, Cork · Cork County Council · Planning ref 19/05876
Construction of 40 No. Residential Units and associated site works, 80 to 119 inclusive at Maple Woods, Ballynacorra, Midleton, Co. Cork
Notice-stated scale
40 units · 79,626 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0101149CC BCMS open-data feed
Proposed construction of 40 No. Residential Units Numbers 80 to 119 inclusive and associated site works at Maple Woods, Ballynacorra, Midleton, Co.Cork
40 units · 4,360 m²Builder not named
06 Jun 2023
CN0097149CC BCMS open-data feed
Construction of 40 No. Residential Units and associated site works, 80 to 119 inclusive at Maple Woods, Ballynacorra, Midleton, Co. Cork
40 units · 79,626 m²Builder not named
06 Feb 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 May 2023 · Latest notice
2 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref PWSDZ3207/21
Proposed construction of Phase1 Commercial and Residential Blocks (K,M,O) over a single storey Basement, at Former Irish Glass Bottle site, Ringsend, Dublin 4.
Notice-stated scale
570 units · 62,985 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0101089DC BCMS open-data feed
Proposed construction of Phase1 Commercial and Residential Blocks (K,M,O) over a single storey Basement, at Former Irish Glass Bottle site, Ringsend, Dublin 4.
570 units · 62,985 m²Builder not named
25 May 2023
SN0007572DC BCMS open-data feed
Proposed Construction of piling, pile caps and piling matt forming substructure to Phase 1 Commercial and Residential Blocks (K,M,O), at Former Irish Glass Bottle Site, Ringsend, Dublin 4
18,406 m²Builder not named
22 Aug 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 May 2023 · Latest notice
2 notices · phased
Kilmeadan, Waterford · Waterford City and County Council · Planning ref 22507
Ph2 Clochán, Adamstown, Kilmeadan, Co. Waterford
Notice-stated scale
67 units · 7,910 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0100865WD BCMS open-data feed
Ph2 Clochán, Adamstown, Kilmeadan, Co. Waterford
67 units · 7,910 m²Builder not named
22 May 2023
CN0098936WD BCMS open-data feed
Ph2 Clochán, Adamstown, Kilmeadan, Co. Waterford
67 units · 7,910 m²Builder not named
27 Mar 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
08 May 2023 · Latest notice
2 notices · phased
Dublin 7, Dublin · Dublin City Council · Planning ref Part 8 Planning Registry number is 3814/20. Report No. 97/2021
Construction of a 4 storey apartment building including community facilities at St. Finbar's Court, St. Finbar's Road, Cabra, Dublin 7 (Block A)
Notice identity Works stated Scale Commenced
CN0100335DC BCMS owner-supplied export
Construction of a 4 storey apartment building including community facilities at St. Finbar's Court, St. Finbar's Road, Cabra, Dublin 7 (Block A)
22 units · 1,790.4 m²Builder named
08 May 2023
CN0100337DC BCMS open-data feed
Construction of a 4 storey apartment building at St. Finbar's Court, St. Finbar's Road, Cabra, Dublin 7 (Block B)
24 units · 1,789.6 m²Builder not named
08 May 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Apr 2023 · Latest notice
4 notices · phased
Lusk, Dublin · Fingal County Council · Planning ref F20A/0523
Construction of 50 houses on lands east of the Rathmore Road and south of the Raheny Roundabout in Lusk, Co. Dublin
Notice-stated scale
50 units · 5,711 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0099853FL BCMS open-data feed
Construction of 50 houses on lands east of the Rathmore Road and south of the Raheny Roundabout in Lusk, Co. Dublin
50 units · 5,711 m²Builder not named
17 Apr 2023
SN0007837FL BCMS open-data feed
Construction of a 3 storey residential building containing 7 no. dwellings on lands betweeen Raheny Close and the Rathmore Road at Lusk, Co. Dublin
7 units · 759 m²Builder not named
05 Nov 2022
SN0007838FL BCMS open-data feed
Construction of a 3 storey residential building containing 7 no. dwellings on lands betweeen Raheny Close and the Rathmore Road at Lusk, Co. Dublin
7 units · 763 m²Builder not named
04 Nov 2022
CN0087514FL BCMS open-data feed
The construction of 27 houses: Nos. 5-19 (odd) Loughcommon Court, Nos. 3-9 (odd) Raheny Close, Nos. 1-4 Sharl Green, Nos. 1-6 Dame Lane, No. 2 Sharl Court, Nos. 1-4 Sharl Close, Lusk, Co. Dublin.
27 units · 3,244.2 m²Builder not named
21 Mar 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Mar 2023 · Latest notice
3 notices · phased
Navan, Meath · Meath County Council · Planning ref 22/1202
Construction of 24 No. two storey houses on lands to the east of Trim Road , Navan, Co. Meath as permitted under Planning Reg Ref 22/1202
Notice-stated scale
24 units · 33,976 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0098927MH BCMS open-data feed
Construction of 24 No. two storey houses on lands to the east of Trim Road , Navan, Co. Meath as permitted under Planning Reg Ref 22/1202
24 units · 33,976 m²Builder not named
20 Mar 2023
SN0008237MH BCMS open-data feed
Construction of Duplex Block B (12 residential units) on lands to the east of Trim Road, Navan, Co. Meath as permitted under Planning Reg Ref 22/1202
12 units · 1,245 m²Builder not named
13 Mar 2023
SN0008238MH BCMS open-data feed
Construction of Duplex Block A (12 residential units) on lands to the east of Trim Road, Navan, Co. Meath as permitted under Planning Reg Ref 22/1202
12 units · 1,246 m²Builder not named
13 Mar 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
10 Mar 2023 · Latest notice
3 notices · phased
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP-306583-20, ABP-310918-21
Erection of 6 storey Block F Apartment building – 40 dwellings, amenity space & roof terrace. Erection of 5-7 storey Block G Apartment building – 111 dwellings, amenity space, cycle store and ESB substation. Erection of 6 storey Block H Apartment building – 61 dwellings, amenity space & roof terrace. Works include all site works, associated Roads, Civil and Site Services for this phase of the overall development.
Notice-stated scale
213 units · 21,786.0 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0098396DR BCMS open-data feed
Erection of 6 storey Block F Apartment building – 40 dwellings, amenity space & roof terrace. Erection of 5-7 storey Block G Apartment building – 111 dwellings, amenity space, cycle store and ESB substation. Erection of 6 storey Block H Apartment building – 61 dwellings, amenity space & roof terrace. Works include all site works, associated Roads, Civil and Site Services for this phase of the overall development.
212 units · 20,257 m²Builder not named
10 Mar 2023
CN0096082DR BCMS open-data feed
Erection of 5 Storey Block C Apartment building - 33 dwellings & amenity space. Erection of 3-5 Storey Block D Apartment building - 35 dwellings, amenity space & roof terrace. Erection of 4-6 Storey Block E Apartment building - 104 dwellings & duplexes, amenity space, cycle store and ESB substation. Works include all site works, associated Roads, Civil and Site Services for this phase of the overall development.
172 units · 16,872.4 m²Builder not named
09 Dec 2022
CN0094438DR BCMS open-data feed
Demolition of 1 no. two storey detached house, glasshouses and associated maintenance building. Erection of a single storey creche. Erection of 51no. houses and a substation. Erection of 6 storey Block A apartment building comprising 61 dwellings, associated amenity space, energy centre and substation. Erection of 4-6 storey Block B apartment building comprising 101 dwellings, associated amenity space, cycle store and substation. Works include new site entrance and associated Roads, Civil and Site Services.
213 units · 21,786.0 m²Builder not named
10 Oct 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Mar 2023 · Latest notice
2 notices · phased
Dublin · South Dublin County Council · Planning ref SD198/0002
Construction of 69No residential units and associated site works at Griffeen Avenue, Balgaddy, Co Dublin
Notice-stated scale
69 units · 5,846.7 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0098272SD BCMS open-data feed
Construction of new community centre and associated site works at Griffeen Avenue, Balgaddy, Co Dublin
507 m²Builder not named
07 Mar 2023
CN0096606SD BCMS open-data feed
Construction of 69No residential units and associated site works at Griffeen Avenue, Balgaddy, Co Dublin
69 units · 5,846.7 m²Builder not named
11 Jan 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
28 Feb 2023 · Latest notice
2 notices · phased
Ashford, Wicklow · Wicklow County Council · Planning ref ABP-309503-21
Construction of 99 No. Dwellings and all infrastructure and associated site works
Notice-stated scale
99 units · 11,209.7 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0098391WW BCMS open-data feed
Construction of 9 x 2 bed apartments & 9 x 3 bed duplexes and two storey creche and associated works.
18 units · 2,014 m²Builder not named
28 Feb 2023
CN0088277WW BCMS open-data feed
Construction of 99 No. Dwellings and all infrastructure and associated site works
99 units · 11,209.7 m²Builder not named
12 Apr 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Feb 2023 · Latest notice
2 notices · phased
Dublin 2, Dublin · Dublin City Council · Planning ref 3546/21
Demolition of existing buildings (No. 18/19 Richmond Street South) and enabling works to facilitate the proposed construction of Block 7, Unit No.s 1 – 22 (11no. 1 bed and 11 no. 2 bed), 2no. commercial ground floor units, ancillary bin/plant rooms and all ancillary site development works.
Notice identity Works stated Scale Commenced
CN0097703DC BCMS open-data feed
This Commencement Notice relates to a single stair residential building with 6 stories of apartments over 2no. own door commercial units at ground floor. The scheme will comprise of 22 apartments over 6 stories with the top floor level 19.9m above ground floor at entrance level. It is proposed to provide 2no of 1-bed and 2no of 2-bed apartments per floor on floors 1 to 5. The 6th floor will have 1no 1-bed, 1no 2-bed, and an open roof terrace. The commercial units (A&B) on ground floor measure 158 & 90m2 respectively. There is also a bin store and plant room located on the ground floor. The 2 separate uses have been designed as independent from a means of escape and compartmentation perspective.
22 units · 2,463 m²Builder not named
13 Feb 2023
CN0096239DC BCMS owner-supplied export
Demolition of existing buildings (No. 18/19 Richmond Street South) and enabling works to facilitate the proposed construction of Block 7, Unit No.s 1 – 22 (11no. 1 bed and 11 no. 2 bed), 2no. commercial ground floor units, ancillary bin/plant rooms and all ancillary site development works.
22 units · 2,463 m²Builder named
13 Dec 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
26 Jan 2023 · Latest notice
2 notices · phased
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP-312216-21
Construction of 55 Residential units at Glenamuck Manor, Glenamuck Road, Kiltiernan, Dublin 18
Notice-stated scale
55 units · 10,965 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0097089DR BCMS open-data feed
Construction of 55 Residential units at Glenamuck Manor, Glenamuck Road, Kiltiernan, Dublin 18
55 units · 10,965 m²Builder not named
26 Jan 2023
SN0007888DR BCMS open-data feed
Construction of mixed-use development, consisting of 1 No. Block containing 28 No. Apartments and Childcare facility, at Glenamuck Road, Kiltiernan, Dublin 18.
28 units · 3,131.5 m²Builder not named
18 Nov 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 Oct 2022 · Latest notice
3 notices · phased
Lucan, Dublin · South Dublin County Council · Planning ref SDZ21A/0014
Aderrig Phase 2 (Duplexes T1, T4, T18, T25, T27) Adamstown, Lucan, Co. Dublin comprising the construction of 5 No. new 3 to 4-storey duplex blocks including associated site development works.
Notice-stated scale
123 units · 14,188.1 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0094942SD BCMS open-data feed
Aderrig Phase 2 (Duplexes T1, T4, T18, T25, T27) Adamstown, Lucan, Co. Dublin comprising the construction of 5 No. new 3 to 4-storey duplex blocks including associated site development works.
68 units · 7,066.8 m²Builder not named
25 Oct 2022
CN0092147SD BCMS open-data feed
Aderrig Phase 2 (Duplexes T3, T14, T26), Adamstown, Lucan, Co. Dublin comprising the construction of 3 No. new 3-storey duplex blocks including associated site development works.
36 units · 3,622.1 m²Builder not named
02 Aug 2022
CN0091254SD BCMS open-data feed
Aderrig Phase 2 (Houses), Adamstown, Lucan, Co. Dublin comprising the construction of 123 No. new 2 & 3-storey terrace dwellings including associated site development works.
123 units · 14,188.1 m²Builder not named
06 Jul 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Oct 2022 · Latest notice
4 notices · phased
Bray, Wicklow · Wicklow County Council · Planning ref ABP-305058-19
Construction of 30 no. 3 & 4 bed two storey houses in 4 no. buildings, 18 no. 1 & 2 bed 3 storey Duplex units and a stand-alone substation. Works also include construction of roads, footpaths, landscaping, drainage & underground services and associated site works.
Notice identity Works stated Scale Commenced
SN0007786WW BCMS open-data feed
Fit out to first floor shell unit at Neighbourhood centre, Southern cross Road, Bray, Co Wicklow
399.2 m²Builder not named
20 Oct 2022
CN0074484WW BCMS open-data feed
Construction of 30 no. 3 & 4 bed two storey houses in 4 no. buildings, 18 no. 1 & 2 bed 3 storey Duplex units and a stand-alone substation. Works also include construction of roads, footpaths, landscaping, drainage & underground services and associated site works.
48 units · 5,472 m²Builder not named
27 Apr 2021
CN0070952WW BCMS open-data feed
Construction of 160 no. 1 & 2 bed apartments in 4 no. buildings (2 of which share a common basement & podium) & a separate bin store. Works also include construction of roads, footpaths, landscaping, drainage & underground services and associated site works.
160 units · 40,580 m²Builder not named
26 Nov 2020
CN0067680WW BCMS owner-supplied export
Construction of a proposed neighbourhood centre, with a total floor area of 1,484 sqm over 2 no. levels, comprising of retail units, community use units, a creche, car parking and associated landscaping works.
1,484 m²Builder named
27 Aug 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
19 Oct 2022 · Commenced
1 notice · 1 source identity
Shillelagh, Wicklow · Wicklow County Council
Construction of 20 housing units at Ard Darach, Ballard, Shillelagh, Co. Wicklow and all associated works.
New build
10 Oct 2022 · Latest notice
2 notices · phased
Tullamore, Offaly · Offaly County Council · Planning ref 17/231,18/555,21/137,22/53
Construction of Phase 5 of an eight phase development consisting of a total of 36 number houses two storey dwellings for this phase (22 No. Type S1, four bedroom, two-storey semi-detached house, 3 No. Type U1, three bedroom, two-storey semi-detached house, 3 No. Type U2, three bedroom, two-storey semi-detached house, 2 No. Type U3, three bedroom, two-storey semi-detached house, 2 No. Type U4, three bedroom, two-storey semi-detached house, 4 No. Type B, three bedroom, two-storey terrace house).Associated public open space, landscaping, roads, parking and infrastructure accessed off the Eiscir Meadows/Norbury Woods, Arden, Tullamore, County Offaly.
Notice-stated scale
36 units · 37,807.9 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0007742OY BCMS open-data feed
Construction of Apartment Block
6 units · 469.4 m²Builder not named
10 Oct 2022
CN0094277OY BCMS open-data feed
Construction of Phase 5 of an eight phase development consisting of a total of 36 number houses two storey dwellings for this phase (22 No. Type S1, four bedroom, two-storey semi-detached house, 3 No. Type U1, three bedroom, two-storey semi-detached house, 3 No. Type U2, three bedroom, two-storey semi-detached house, 2 No. Type U3, three bedroom, two-storey semi-detached house, 2 No. Type U4, three bedroom, two-storey semi-detached house, 4 No. Type B, three bedroom, two-storey terrace house).Associated public open space, landscaping, roads, parking and infrastructure accessed off the Eiscir Meadows/Norbury Woods, Arden, Tullamore, County Offaly.
36 units · 37,807.9 m²Builder not named
04 Oct 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 Sep 2022 · Latest notice
2 notices · phased
Portlaoise, Laois · Laois County Council · Planning ref 21/853
Construction of 43 No. dwellings numbered 1-19 The Avenue 1-24 The Meadow Mount Stewart Portlaoise. Permitted under planning Reg Ref No 21/853
Notice identity Works stated Scale Commenced
CN0094250LS BCMS open-data feed
Construction of 43 No. dwellings numbered 1-19 The Avenue 1-24 The Meadow Mount Stewart Portlaoise. Permitted under planning Reg Ref No 21/853
43 units · 5,385.4 m²Builder not named
29 Sep 2022
CN0089285LS BCMS owner-supplied export
Construction of 12 No. dwelling houses numbered 2-13 The Drive Mount Stewart, Portlaoise. Permitted under planning Reg Ref No 21/853
12 units · 1,532 m²Builder named
16 May 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 Sep 2022 · Latest notice
2 notices · phased
Rathcormac, Cork · Cork County Council · Planning ref 214572
Construction of 39 No. Two Storey Dwellings at Lisnagar Demense, Rathcormac, Co. Cork. [House Nos 19-32 & 37-61]
Notice-stated scale
39 units · 5,422.4 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0093906CC BCMS open-data feed
Construction of 39 No. Two Storey Dwellings at Lisnagar Demense, Rathcormac, Co. Cork. [House Nos 19-32 & 37-61]
39 units · 5,422.4 m²Builder not named
27 Sep 2022
CN0086351CC BCMS open-data feed
Construction of 22 No. Two Storey Dwellings at Lisnagar Demense, Rathcormac, Co. Cork. [House Nos 1-18 & 33-36]
22 units · 2,942.3 m²Builder not named
23 Feb 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
26 Sep 2022 · Latest notice
2 notices · phased
Waterford, Waterford · Waterford City and County Council · Planning ref Part VIII Application
Construction of 37 No. Residential Units comprising 4no. 3-bed 2-storey houses, 28 no. 2-bed 2 storey houses and 5no. 2-ved single-storey houses; along with all necessary ancillary site development works.
Notice identity Works stated Scale Commenced
SN0007688WD BCMS open-data feed
Construction of 12 No. Units comprising of 6 duplexes and 6 apartments and all associated ancillary site works.
12 units · 1,086.5 m²Builder not named
26 Sep 2022
CN0092949WD BCMS owner-supplied export
Construction of 37 No. Residential Units comprising 4no. 3-bed 2-storey houses, 28 no. 2-bed 2 storey houses and 5no. 2-ved single-storey houses; along with all necessary ancillary site development works.
37 units · 3,096 m²Builder named
29 Aug 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Sep 2022 · Latest notice
4 notices · phased
Swords, Dublin · Fingal County Council · Planning ref F17A/0735
53 houses at Miller's Glen, Oldtown, Swords, Co. Dublin: 3-10(cont), 12,13 Meadowbank Rd, 1-11(odds),14-28(evens) Meadowbank Lane, 18-32(evens) Meadowbank Green, 1,2,3,5 Meadowbank Grove, 1-19(odds), 4 Meadowbank Row, 71-81(odds) Longview Ave.
Notice identity Works stated Scale Commenced
CN0093865FL BCMS owner-supplied export
The development consists of the construction of Block E, comprising of 15 No. Apartments at 02 Meadowbank Row, Oldtown, Swords, Co. Dublin.
15 units · 1,360 m²Builder named
20 Sep 2022
CN0093909FL BCMS owner-supplied export
The development consists of the construction of Block D, comprising of 15 No. Apartments at 7 Meadowbank Grove, Oldtown, Swords, Co. Dublin.
15 units · 1,360 m²Builder named
20 Sep 2022
CN0093467FL BCMS owner-supplied export
The development consists of the construction of Block F, comprising of 15 No. Apartments at 11 Meadowbank Road, Oldtown, Swords, Co. Dublin.
15 units · 1,360 m²Builder named
08 Sep 2022
CN0043534FL BCMS open-data feed
53 houses at Miller's Glen, Oldtown, Swords, Co. Dublin: 3-10(cont), 12,13 Meadowbank Rd, 1-11(odds),14-28(evens) Meadowbank Lane, 18-32(evens) Meadowbank Green, 1,2,3,5 Meadowbank Grove, 1-19(odds), 4 Meadowbank Row, 71-81(odds) Longview Ave.
53 units · 51,031 m²Builder not named
13 Sep 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
03 Aug 2022 · Latest notice
3 notices · phased
Dublin 14, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP-304469-19
Proposed construction of a new building comprising 3 residential blocks (Blocks A, B and C) over a shared basement with ancillary accommodation at ground floor of Block A at Greenacres Residential Development, Kilmacud Road Upper, Co. Dublin.
Notice identity Works stated Scale Commenced
SN0007504DR BCMS open-data feed
It is proposed to construct an Electricity Supply Board (ESB) Double Substation, and two Offloader Rooms, within an external service area of the main residential building at Greenacres Kilmacud Road Upper, Dundrum Dublin 14.
51.5 m²Builder not named
03 Aug 2022
SN0005566DR BCMS open-data feed
Proposed construction of a new building comprising 3 residential blocks (Blocks A, B and C) over a shared basement with ancillary accommodation at ground floor of Block A at Greenacres Residential Development, Kilmacud Road Upper, Co. Dublin.
253 units · 29,237 m²Builder not named
28 Sep 2020
CN0057083DR BCMS owner-supplied export
Demolition of 2 no dwellings and associated outbuildings to prepare for the construction of 253 no one, two and three bedroom apartments to be commenced shortly under a Commencement Notice with Documentation, at Greenacres, Upper Kilmacud Road, Dundrum, Dublin 14.
253 units · 29.2 m²Builder named
18 Sep 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Jun 2022 · Latest notice
2 notices · phased
Dun Laoghaire, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP30428819
The proposed development relates to the provision of 192 no. apartments in two no. blocks at Clay Farm, Ballyogan Road, Dublin 18, Dun Laoghaire, Dublin. Block G contains a total of 125 no. apartments and ranges in height from four to six storeys over basement car park. Block E7 contains a total of 67 no. apartments and ranges in height from five to six storeys over basement car park.
Notice-stated scale
192 units · 26,070 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0090934DR BCMS open-data feed
Fit-out of indoor communal amenity areas at Clay Farm 1C Block G. Located at Ground Floor level is a Concierge/ Reception Area with Disabled WC, Parcel Room, Lounge and Store. At 5th Floor level is a Lounge and Meeting Room with Disabled WC. Works include installation of partitions & internal joinery, wall, ceiling and floor finishes, M&E (excluding previous Life Safety systems- FA&EL), sanitaryware and furniture.
222 m²Builder not named
30 Jun 2022
CN0061695DR BCMS open-data feed
The proposed development relates to the provision of 192 no. apartments in two no. blocks at Clay Farm, Ballyogan Road, Dublin 18, Dun Laoghaire, Dublin. Block G contains a total of 125 no. apartments and ranges in height from four to six storeys over basement car park. Block E7 contains a total of 67 no. apartments and ranges in height from five to six storeys over basement car park.
192 units · 26,070 m²Builder not named
13 Feb 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.