Commencement notice group
Housing commencement notices — Dun Laoghaire
Dun Laoghaire, Dublin
2 unique commencement events · latest notified commencement 30 Jun 2022 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 30 Jun 2022
- Latest notice
- 222 m²
- Planning references supplied
- ABP-304288-19
- Public location
- Dun Laoghaire, Dublin
Public source geography
Site location
- Public site / locality
- Dun Laoghaire, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin, Dublin
- Clay Farm 1C Block G
- Clay Farm, Ballyogan Road, Dublin 18, Dun Laoghaire, Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-304288-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Fit-out of indoor communal amenity areas at Clay Farm 1C Block G. Located at Ground Floor level is a Concierge/ Reception Area with Disabled WC, Parcel Room, Lounge and Store. At 5th Floor level is a Lounge and Meeting Room with Disabled WC. Works include installation of partitions & internal joinery, wall, ceiling and floor finishes, M&E (excluding previous Life Safety systems- FA&EL), sanitaryware and furniture.
Floor area stated for this source: 222 m².
The proposed development relates to the provision of 192 no. apartments in two no. blocks at Clay Farm, Ballyogan Road, Dublin 18, Dun Laoghaire, Dublin. Block G contains a total of 125 no. apartments and ranges in height from four to six storeys over basement car park. Block E7 contains a total of 67 no. apartments and ranges in height from five to six storeys over basement car park.
Floor area stated for this source: 26,070 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.