Permission for 1) The construction of a 6.1m high single storey extension with a floor area of 176m2 for the Pack-Off area located at the southeast corner of the existing production facility, 2) The construction of a 14m high new fire escape staircase of 55.4m2 connecting the ground floor, mezzanine and roof located at the southeast corner of the existing warehouse, 3) External galvanised steel fire escape stairs to south elevation of existing warehouse to provide fire escape from new Pack-Off roof and existing mezzanine to ground floor level
Permission for 1) The construction of a 6.1m high single storey extension with a floor area of 176m2 for the Pack-Off area located at the southeast corner of the existing production facility, 2) The construction of a 14m high new fire escape staircase of 55...
The construction of a 6,574m² bakery building over two storeys (ground floor: 3,814m² & first floor: 2,760m²), and retaining part of the existing steel structure approved under Planning Permission Reference N°061187 granted on 24.01.2007. The proposed b...
Permission for extensions and alterations to our existing facility as follows: 1. Single storey extensions to the production area including various internal alterations and associated external plant, 2. Single storey extensions consisting of packaging &...
a minor amendment to a previously granted planning permission (PL 25/60315) to construct an ESB MV Substation. The amendment comprises an increase from 11.26m as granted, to a proposed 14.97M, (increase in overall length of c.3.71m). The works also comprise...