Record 2460293. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.
development, located to the northeast of the existing facility, will consist of a new ESB substation and switch room to serve the existing facility. The substation measures 45.7m2 in plan area and 3.5m in height. The switchroom and a back up generator will be located on a raised gantry that will measure 121m2 and 7m in height and be situated 3.5m above ground level
EnergyH&S triggerInfrastructureGoing to sitesource=commencement
Map
Project lifecycle links
possible planning/tender connection; planning application -> commencement notice filed
4 linked records
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Commencement notice filed - going to site 2025-06-13. Builder: Kilcawley Construction.
Current/open TED notice18 days leftValue not stated
Ireland – Roadworks – SCC2026 0082 N16 Lugatober to County Boundary Pavement Resurfacing Contract Retender
Sligo County Council
TED public notice feed / ted:401046-2026 / Published 2026-06-11 / deadline 2026-07-10
The development will consist of a) Warehouse building with ancillary accommodation on 2 levels and a 4,945 sq.m total gross floor area, b) Single storey ESB substation building, c) Vehicular access to the site off the existing l3700 roadway at two locations...
development consisting of the following 1. construction of new dressing room building 2. sewerage pumping station to pump effluent from site to public foul sewer system 3. construction of new training pitch and all associated site works
The development will comprise the following: a) Proposed extensions totalling circa. 595m2 to the existing Sligo Junction Filling Station consisting of additional seating, stores, food prep and sales areas, additional toilet facilities, staff welfare facili...
The construction of a 6,574m² bakery building over two storeys (ground floor: 3,814m² & first floor: 2,760m²), and retaining part of the existing steel structure approved under Planning Permission Reference N°061187 granted on 24.01.2007. The proposed b...
a minor amendment to a previously granted planning permission (PL 25/60315) to construct an ESB MV Substation. The amendment comprises an increase from 11.26m as granted, to a proposed 14.97M, (increase in overall length of c.3.71m). The works also comprise...