Kildare County Council / 20294

Infrastructure, Maudlins House Hotel, , Maudlins,, Dublin Rd., Naas,, Co. Kildare. - Planning Application 20294

the construction of an extension to Maudlins House Hotel which was constructed under planning permission 00/500124, over an existing basement car park...

Source: Owner-supplied commencement export

Record 20294. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.

Open source record

Development Description

the construction of an extension to Maudlins House Hotel which was constructed under planning permission 00/500124, over an existing basement car park. The proposed extension comprises of 70 no. aparthotel rooms over 6 floors including a meeting room on each floor with a single storey pedestrian link bridge/walkway to the existing hotel building and all associated facilities. All goods deliveries will continue to the existing delivery yard and the existing Maudlins House Hotel entrance and frontage to the Dublin Road will remain unchanged. All foul and surface water discharge are to be connected into existing foul and surface water systems (network on site) with final discharge to the public mains. The planning is made further to planning applications 98/500157, 00/500113, 00/500124, 02/500024 and 07/500124. The development consists of works being carried out in the curtilage of protected structure “Maudlins Farmhouse” RPS Ref. NS 19-096

Fire / FSC likelyH&S triggerInfrastructureGoing to sitesource=commencement

Map

Same county

Related leads nearby

5 records
Kildare County Council / 221478 / 2024-07-09

Monread Road,, Maudlings Townland,, Naas,, Co. Kildare.

development on lands measuring 4,829 hectares between the M7 motorway and Monread Road at Monread Road, Maudlings (Townland), Naas, Co. Kildare (adjacent to the Globe Retail Park): The development will consist of: Demolition of all existing buildings on the...

Stage
Commencement
Est. value band
EUR 30m+
Applicant
Red Rock Logistics Naas Ltd
Units / floor
units unknown / 17174 m2 (floor estimated)
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
David Xx Mulcahy, Planning Consultants Ltd
EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Owner-supplied commencement export / official file linked

Kildare County Council / 24393 / 2026-05-31

Newbridge, Kildare

For the consolidation and extend the established and permitted industrial and related activities on the MIL headquarters and industrial site to accommodate immediate and medium-term business development and employment generation objectives, to rationalise t...

Stage
Commencement
Est. value band
EUR 1m-3m
Applicant
Great Connell Murphy Investments Ltd (Gcmil)
Units / floor
units unknown / 2152 m2 (floor estimated)
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
Great Connell Murphy Investments Ltd (Gcmil)
EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Owner-supplied commencement export / official file linked

for a 10-year permission for the expansion of the brewery facility (permitted under Reg. Ref: 22/1291 and ABP Ref.: 316491 (referred to below as Brewery 1) and described as follows: Brewery 2 Building: (c.9,333m2) Single and two-storey building including br...

Stage
Commencement
Est. value band
EUR 250k-500k
Applicant
Diageo Ireland
Units / floor
units unknown / 483 m2 (floor estimated)
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
John Spain
Fire / FSC likelyH&S triggerInfrastructureGoing to site

Source: Owner-supplied commencement export / official file linked

Kildare County Council / 18250 / 2024-11-22

Killeenlea, Ardrass Lower & Killadoon, Celbridge, Co.Kildare

a 10 year permission (to construct development) for a solar farm comprising: the installation of photovoltaic panels on ground mounted frames in rows on a site of C.47.44 hectares, a single storey onsite 38kV substation with compound, with 2 no single store...

Stage
Commencement
Applicant
Elgin Energy Services Ltd
Units / floor
units unknown / floor unknown
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
Rps Group Ltd
EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Owner-supplied commencement export / official file linked

for • The construction of 1 no. warehousing/industrial/logistics building (approx. 11,901 sqm total GFA and 16.37m in height) including ancillary office space, reception area, lobby, circulation areas, plant, tea stations, stores, a gym, a canteen, meeting ...

Stage
New Application
Est. value band
EUR 30m+
Applicant
Green Urban Logistics Development Corporation Ltd
Units / floor
1 unit / 12001 m2 (units estimated, floor estimated)
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
Brock McClure Planning & Dev Consultants
EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Kildare County Council public planning register / official file linked