Development Description
The development will consist of the removal of the timber post and rail fence a
Dun Laoghaire Rathdown County Council / D25A/0612/WEB
The development will consist of the removal of the timber post and rail fence a
Record D25A/0612/WEB. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.
The development will consist of the removal of the timber post and rail fence a
Project lifecycle links
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Commencement notice filed - going to site 2026-06-08. Builder: builder not listed.
The development will consist of the removal of the timber post and rail fence and the erection of a new two-storey pitched roof dwelling with balcony, a new garden wall/fence, the lowering of the existing block wall facing Newtown Park a...
Contextual resources
See this authority's related leads, appeals, tenders and historical commencements.
Rough-check planning application fees before quoting or filing.
Browse warehouse, logistics and industrial planning records.
See what a commencement notice means for site-start timing.
Safety statement, RAMS, AF notices, training cards and site templates.
Useful when this lead implies contractor, PSCS or site-safety demand.
Same county
The proposed development consists of the demolition and removal of two vacant and derelict industrial sheds to the rear of the protected structure (RPS Ref: 118 Two Storey Industrial Building at 12th Lock, Grand Canal Lucan) and the change of use of a large...
Source: Owner-supplied commencement export / official file linked
Permission for development at a site (c. 0.04 ha) at the The Cope, 8th Lock, Ratoath Road and Hamilton View, Pelletstown, Dublin 11. Otherwise bounded generally by Ratoath Road to the east, Tolka Valley Park and Royal Canal House to the north-west, Hamilton...
Source: Owner-supplied commencement export / source record not directly linked
Creation of new vehicular entrance to accommodate 1 car park space, Construct new 2 bed single storey dwelling. Construct new 1.8M high retaining wall to replace existing retaining wall and form pedestrian gate entrance on Ardeevin Court side of new wall. C...
Source: Owner-supplied commencement export / official file linked
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (wi...
Source: South Dublin County Council public planning register / official file linked
1. An extension to the existing depot to provide two new LUAS maintenance lanes (Nos. 7 and 8) at lower ground floor level. 2. Extension of existing maintenance lanes 3 and 4 at lower ground floor level. 3. A first-floor extension to accommodate a Central C...
Source: South Dublin County Council public planning register / official file linked