Development Description
PRE-SCHOOL FACILITY, LOCATED WITHIN EXISTING COMMUNITY CENTRE BUILDING
Donegal County Council / 2660947
PRE-SCHOOL FACILITY, LOCATED WITHIN EXISTING COMMUNITY CENTRE BUILDING
Record 2660947. Direct source URL supplied by the public planning feed. Use the authority file for final verification before acting.
PRE-SCHOOL FACILITY, LOCATED WITHIN EXISTING COMMUNITY CENTRE BUILDING
Project lifecycle links
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Donegal County Council
Donegal County Council
Donegal County Council
Contextual resources
See this authority's related leads, appeals, tenders and historical commencements.
Rough-check planning application fees before quoting or filing.
Safety statement, RAMS, AF notices, training cards and site templates.
Useful when this lead implies contractor, PSCS or site-safety demand.
Construction-start paperwork and safety notification context.
Same county
PRE-SCHOOL FACILITY, LOCATED WITHIN EXISTING COMMUNITY CENTRE BUILDING
Source: Donegal County Council public planning register / official file linked
CHANGE OF USE OF AN EXISTING CLASSROOM IN THE SCHOOL TO PROVIDE FOR PRE-SCHOOL, PLAYSCHOOL AND AFTER-SCHOOL ACTIVITIES / SERVICES INCLUDING MINOR ALTERATIONS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
Source: Donegal County Council public planning register / official file linked
NEW ENTRANCE, ACCESS LANEWAY, CAR PARKING SPACE, 2 NO. SPORTS PLAYING PITCHES, PORTACABIN DRESSING ROOMS, TOILETS AND STORAGE AREA, PORTACABIN TOILET AND STORAGE AREA AND CONNECTION TO SEPTIC TANK AND PERCOLATION AREA
Source: Donegal County Council public planning register / official file linked
NEW ENTRANCE, ACCESS LANEWAY, CAR PARKING SPACE, 2 NO. SPORTS PLAYING PITCHES, PORTACABIN DRESSING ROOMS, TOILETS AND STORAGE AREA, PORTACABIN TOILET AND STORAGE AREA WITH CONNECTION TO SEPTIC TANK AND PERCOLATION AREA
Source: Donegal County Council public planning register / official file linked
(1) REMOVAL OF THE EXISTING CONSERVATORY, (2) CONSTRUCTION OF (A) A NEW 13M2 CONSERVATORY AND (B) A SINGLE STOREY 110M2 EXTENSION TO THE REAR, AND (3) ALL ASSOCIATED HARD LANDSCAPING WORKS AND INSTALLATION OF A NEW WASTEWATER TREATMENT PLANT AND PERCOLATION...
Source: Owner-supplied commencement export / official file linked