Commercial new build, Cloughduv, Cork - Planning Application 24/4783
Permission for the construction of a Creche Facility (473m sq.) together with 13 car parking spaces and associated site development works including the...
Record 24/4783. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.
Permission for the construction of a Creche Facility (473m sq.) together with 13 car parking spaces and associated site development works including the provision of a new entrance from L2216. This application is associated with the Páirc Brouen Residential Development (Phase I, permitted under Planning Reference Number 22/4627 and Phase II, currently applied for under 23-6606).
Commercial new buildFire / FSC likelyGoing to sitesource=commencement
Map
Project lifecycle links
planning application -> commencement notice filed
1 linked records
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Commencement notice filed - going to site 2025-05-19. Builder: DHC Construction LTD.
Permission for the construction of a single storey extension to building IE8 and associated site works. The proposed development is covered by an existing Industrial Emissions (IE) Licence no. P0009-05. The development refers to a modification to an establi...
Permission for the installation of 2674m2 of roof mounted solar photovoltaic panels for a 604 kWp System and all ancillary works and services at Constellation Cold Logistics, Lehenaghmore Industrial Estate, Lehenaghmore, Togher, Co. Cork, T12XW25. This appl...
Planning Permission for the construction of an extension to the existing industrial building and all associated site works on the site of their existing facility. The proposed development includes: (1) Construction of new extension to North and West elevati...
Permission for development at the Leonardo Hotel, Anderson's Quay, Cork City, T12DCR9. The proposed development will consist of a five-storey extension to the western elevation of the existing hotel building, to provide a staff canteen, switch room, an...
the removal of a section of existing boundary palisade fencing (c.2.4m in height) along the Midleton Distillery’s western boundary and the installation of new replacement boundary palisade fencing (c.3m in height) and all associated site development works. ...