Record 2342546. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.
Permission is sought for the demolition of an existing waste collection canopy, screening wall fencing, a pipe bridge and a small section of the loading bay retaining wall and steps, together with the construction of a single-storey Utilities Building extension, comprising a separate chilled water plant room and electrical switch room, with rooftop platform and equipment (housed behind an acoustic parapet wall), a rooftop access bridge, a roof access ladder and associated site works, at the existing facility at Boston Scientific Ireland Ltd., Cork Business and Technology Park, Model Farm Road, Cork, T12YK88. The development is within the curtilage of a Protected Structure PS637 'Former Munster Institute'.
H&S triggerInfrastructureVacant / reuse signalGoing to sitesource=commencement
Map
Project lifecycle links
possible planning/tender connection; planning application -> commencement notice filed
4 linked records
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Commencement notice filed - going to site 2026-04-15. Builder: builder not listed.
Current/open TED notice4 days leftEUR 15,000,000
Ireland – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Cork Docklands to City Centre Road Network Improvement Scheme
Cork City Council
TED public notice feed / ted:371968-2026 / Published 2026-06-01 / deadline 2026-06-26
Permission for the construction and operation of a 20-bedroom residential care home, the construction of a storage shed, electrical substation, switch room, service yard, covered storage area and enclosure; the demolition of existing agricultural sheds and ...
A 10-year permission for the construction of a battery energy storage system (BESS) facility consisting of two single-storey BESS units, two single-storey power conversion system (PCS) units, a single storey transformer station, underground cabling connecti...
The construction of a new two-bedroom holiday let unit on the footprint of a previously permitted farm workshop (planning reference no. 25/04496); the change of use and conversion of an existing disused milking parlour to provide two self-catering holiday l...
Permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (0.42 ha) Blarney Business Park, Clogheenmilcon, Blarney, Co. Cork. The site is generally bound to the west by the Blarney Business Park access road; ...