the provision of independent and assisted living accommodation, the development will comprise of the construction of 2 blocks of 3 number single storey...
Record 2460074. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.
the provision of independent and assisted living accommodation, the development will comprise of the construction of 2 blocks of 3 number single storey units, splayed entrance, connection to local watermain, public sewer, and all associated site development works, including the demolition of existing disused buildings
H&S triggerSmall multi-unitVacant / reuse signalGoing to sitesource=commencement
Map
Project lifecycle links
planning application -> commencement notice filed
1 linked records
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Commencement notice filed - going to site 2025-06-11. Builder: Debcon Construction Ltd.
Construction of 2 blocks of 3 number single storey units, splayed entrance, connection to local watermain, public sewer and all associated site development works including the demolition of existing disused buildings
Construction of 2 blocks of 3 number single storey units, splayed entrance, connection to local watermain, public sewer and all associated site development works including the demolition of existing disused buildings
Notice
Commencement Notice With Compliance Documentation
Commencement
2025-06-11
Source
Owner-supplied commencement export; no public source URL
Location
Tullow, Carlow
Council
Carlow County Council
Builder
Debcon Construction Ltd
Units / floor
6 units / 770.4 m2
Current commencementCommencement Notice With Compliance DocumentationOwner exportSubstantial building works
the construction of 65 number two storey dwellings, comprising of 22 number semi-detached dwellings, 9 blocks of 3 number terraced dwellings and 4 blocks of 4 number terraced dwellings, new splayed vehicular entrance and separate pedestrian access, connecti...
Stage
Further Information
Est. value band
EUR 30m+
Applicant
Peter Bolger Consulting Ltd
Units / floor
124 units / 6504.1 m2
Useful for
Fire SafetyGroundworksHealth & SafetyMain contractorRoads/Civils
Agent
Peter Bolger
Fire / FSC likelyH&S triggerLarge residential
Source: Carlow County Council public planning register / official file linked
the restoration of a former gravel pit using imported clean, uncontaminated soil and stones (by-product only) within an area of 1.92 hectares for the consequential return to agricultural use. Permission is also sought for all associated site infrastructure ...
Alterations and additions to an existing storey and a half dwelling incorporating new single storey rear extensions, a new storey and a half side extension, new single storey front porch and a new single storey garage to the rear, new wastewater treatment u...
Stage
Commencement
Est. value band
EUR 500k-1m
Applicant
Anthony & Evelyn O’Brien
Units / floor
2 units / 70.5 m2
Useful for
BuilderElectricianPlumberHealth & Safety
Agent
Paul Osborne
Small residentialGoing to sitesource=commencement
Source: Owner-supplied commencement export / official file linked