Infrastructure, Powersknock, Kilmeaden, County Waterford.
the restoration of a disused rock and gravel quarry comprising some 3.52 hectares to agricultural use using imported inert soil and stone classified as Article 27 by-products of the construction industry. It is proposed to import some 270,000m3 of that material over a period not to exceed 5 years. The application is...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Tbeb Ltd
- Planning agent
- Donal Power
- Agent address
- Ballaghablake Curracloe Enniscorthy Y21 C927
Application text
the restoration of a disused rock and gravel quarry comprising some 3.52 hectares to agricultural use using imported inert soil and stone classified as Article 27 by-products of the construction industry. It is proposed to import some 270,000m3 of that material over a period not to exceed 5 years. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and a screening report for Appropriate Assessment (AA)
Application to site progress
-
Applied 2 Jul 2026 2660489
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2660489
the restoration of a disused rock and gravel quarry comprising some 3.52 hectares to agricultural use using imported inert soil and stone classified as Article 27 by-products of the construction industry. It is proposed to import some 270,000m3 of that material over a period not to exceed 5 years. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and a screening report for Appropriate Assessment (AA)