Development Description
for the (1) Construction of a new storey and a half side extension, (2) New single storey front, side and rear extensions, (3) Front, side and rear façade changes, (4) The addition of a new rooflight to the front slope of existing roof and two rooflights to the rear, (5) The replacement of the existing rooftiles with a corrugated metal roof, (6) The demolition of the existing storage building and (7) The installation of a new waste water treatment system and percolation area and all associated site works