Development Description
A 31.34 metre length of 110kV Overhead Electricity Line connecting a Battery Energy Storage System to the Thornsberry 110kV substation
Offaly County Council / 2660301
A 31.34 metre length of 110kV Overhead Electricity Line connecting a Battery Energy Storage System to the Thornsberry 110kV substation
Record 2660301. Direct source URL supplied by the public planning feed. Use the authority file for final verification before acting.
A 31.34 metre length of 110kV Overhead Electricity Line connecting a Battery Energy Storage System to the Thornsberry 110kV substation
Project lifecycle links
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Offaly County Council
Offaly County Council
Offaly County Council
Contextual resources
See this authority's related leads, appeals, tenders and historical commencements.
Rough-check planning application fees before quoting or filing.
Browse warehouse, logistics and industrial planning records.
Browse renewable, grid and energy project records.
Safety statement, RAMS, AF notices, training cards and site templates.
Useful when this lead implies contractor, PSCS or site-safety demand.
Same county
A 31.34 metre length of 110kV Overhead Electricity Line connecting a Battery Energy Storage System to Thornsberry 110kV substation
Source: Offaly County Council public planning register / official file linked
the construction of a new MMC Training Building comprising of a single-storey training workshop, a two storey classroom block with ancillary accommodation with a three storey lift core, roof-mounted PV panels and plant area with connections to existing serv...
Source: Offaly County Council public planning register / official file linked
(RED III) to Install two heat pumps and a 2000l LPG as part of a school heating decarbonisation project under a Renewable Energy Directive III (RED III) Development
Source: Offaly County Council public planning register / official file linked
(RED III) Install two heat pumps and a 2000l LPG as part of a school heating decarbonisation project under a Renewable Energy Directive III (RED III) Development
Source: Offaly County Council public planning register / official file linked
(RED III) the installation of a heat pump and a 2000l LPG tank as part of school decarbonisation project under a Renewable Energy Directive III (RED III) Development
Source: Offaly County Council public planning register / official file linked