Development Description
the proposed development will consist of the reformation of an existing kerb, the construction of a new boundary wall with steel fencing to form an entrance, and the installation of a sliding gate to enclose an area associated with Section 1. The development will maintain the existing right of way serving Section 2 and 3. Signage for JW Construction is also proposed to be installed on the fencing enclosing the newly defined area