GrantedDecision recorded

Agricultural, Dunloe Hotel and Gardens, Dunloe Lower Beaufort Killarney, Co. Kerry

Dunloe Lower Beaufort Killarney, Kerry · Kerry County Council · Plan 2460988 · PB ref PB-10000289943

The development will consist of a) demolition of the existing bedroom wing of the hotel (comprising of two blocks), the spa / leisure and banqueting wing and connecting circulation space all at the main hotel building and demolition of an existing stable block, b) construction of new hotel accommodation comprising of a...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision 19 Feb 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Application-stage scope

What the public record evidences

3 source-supported signals
Agricultural

Agricultural

The public application record identifies agricultural in the submitted planning scope.

2460988Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2460988Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2460988Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

The development will consist of a) demolition of the existing bedroom wing of the hotel (comprising of two blocks), the spa / leisure and banqueting wing and connecting circulation space all at the main hotel building and demolition of an existing stable block, b) construction of new hotel accommodation comprising of a five-storey over part basement bedroom wing containing 97 no. guest rooms; a new two-storey (basement/lower ground floor and ground floor) over part undercroft spa / leisure and banqueting wing (including internal and external swimming pools); a single storey over basement link connecting new spa / leisure and banqueting wing to existing reception building; a two-storey over basement circulation / leisure / services area at the rear of the existing reception building, connecting to the new bedroom wing; a new first floor restaurant and kitchen on an existing first floor terrace area of the existing reception building; and local alterations to the existing reception building to facilitate the interface of the new built elements, c) the provision of photovoltaic solar panels on the roof of the existing reception building, d) the placement of communications antennae on the proposed new bedroom wing, e) revisions to an existing fire tender access route, f) landscaping works including localised ground reprofiling, hard and soft landscaping and amenity lighting, g) localised connections and new works to site surface water, wastewater and water supply infrastructure, and h) all associated site development works. All on a site of approx. 5.076ha.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded Smaller works often do not require a completion certificate.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2460988

The development will consist of a) demolition of the existing bedroom wing of the hotel (comprising of two blocks), the spa / leisure and banqueting wing and connecting circulation space all at the main hotel building and demolition of an existing stable block, b) construction of new hotel accommodation comprising of a five-storey over part basement bedroom wing containing 97 no. guest rooms; a new two-storey (basement/lower ground floor and ground floor) over part undercroft spa / leisure and banqueting wing (including internal and external swimming pools); a single storey over basement link connecting new spa / leisure and banqueting wing to existing reception building; a two-storey over basement circulation / leisure / services area at the rear of the existing reception building, connecting to the new bedroom wing; a new first floor restaurant and kitchen on an existing first floor terrace area of the existing reception building; and local alterations to the existing reception building to facilitate the interface of the new built elements, c) the provision of photovoltaic solar panels on the roof of the existing reception building, d) the placement of communications antennae on the proposed new bedroom wing, e) revisions to an existing fire tender access route, f) landscaping works including localised ground reprofiling, hard and soft landscaping and amenity lighting, g) localised connections and new works to site surface water, wastewater and water supply infrastructure, and h) all associated site development works. All on a site of approx. 5.076ha.

AuthorityKerry County Council
Reference2460988
StatusChecked 2 Jun 2026
Open official record