Record 7003/23. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.
Construction of three blocks of apartments connected by an undercroft carpark on Cromcastle Road. The development will also have two cultural / community spaces located at the ground floor that are being completed to a grey box (shell and core finish but inclusive of life safety systems) standard. The eight storeys high apartment blocks containing 146 apartments and all other associated works are at Cromcastle Road. Dublin 5, Dublin City.
Fire / FSC likelyH&S triggerLarge residentialGoing to sitesource=commencement
455 residential units (including a mixture of 2 and 3 storey semi-detached and terraced houses, and duplex units and apartments in 3 and 4 storey blocks), new internal roads and footpaths, site access, public open space, car parking, cycle stores, landscapi...
Phase 1 (30 HOUSES) of Planning Grant F24A/0612E: (i) construction of a residential development of 30 no. two-storey houses (ii) all associated works, inclusive of public open space provision, landscaping, boundary treatments, vehicular/pedestrian infrastru...
Demolition of 3 existing dwelling houses in addition to 9 farm structures and outbuildings and the construction of 113 residential units comprising 70 two storey dwelling houses (comprising 61 three bed units and 9 four bed units ranging in size from 109sq....
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies o...