Infrastructure, 71, South Mall, Cork City, T12HC79 - Planning Application 26/44587

Permission for the redevelopment of the former bank at No. 71 South Mall, Cork City, T12HC79. The proposed development will consist of the change of...

Source: Cork City Council public planning register

Record 26/44587. Direct source URL supplied by the public planning feed. Use the authority file for final verification before acting.

Open source record

Development Description

Permission for the redevelopment of the former bank at No. 71 South Mall, Cork City, T12HC79. The proposed development will consist of the change of use from a bank to a 58-bedroom hotel with ground floor bar/restaurant/cafe; the demolition of the extant roof structure and upper floor of the four-storey main bank building fronting South Mall and the construction of 2 no. additional storeys, setback from the street elevation over South Mall to form a five-storey building, plus screened rooftop plant area; the demolition of the auxillary buildings to the rear of the main bank building fronting Morgan Street and the construction of a six-storey building plus screened rooftop plant area; the construction of a glazed link bridge over five floors across an open atrium; and the provision of an accessible roof deck fronting South Mall. The proposal provides for preservation and repair of the extant limestone elevation to South Mall and the main banking all. The proposed development makes provision for a customer entrance and service entrance on Morgan Street incorporating public realm improvements, ancillary signage (including illuminated signage) and all associated site development works.

Fire / FSC likelyH&S triggerInfrastructureVacant / reuse signal

Map

No coordinates supplied in the public planning feed.

Same county

Related leads nearby

5 records
Cork County Council / 26/1372 / 2026-05-22

Kilshinahan, Timoleague, Co. Cork

A 10-year permission for the construction of a battery energy storage system (BESS) facility consisting of two single-storey BESS units, two single-storey power conversion system (PCS) units, a single storey transformer station, underground cabling connecti...

Stage
New Application
Applicant
Amarenco Solar Timoleague Ltd
Units / floor
units unknown / floor unknown
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
Cork Online
EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Cork County Council public planning register / official file linked

Cork County Council / 26/1276 / 2026-05-14

Ballinvologe, Minane Bridge, County Cork, P17XP46

The construction of a new two-bedroom holiday let unit on the footprint of a previously permitted farm workshop (planning reference no. 25/04496); the change of use and conversion of an existing disused milking parlour to provide two self-catering holiday l...

Stage
New Application
Applicant
Barry Good
Units / floor
units unknown / floor unknown
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
Barry Good
H&S triggerInfrastructureVacant / reuse signal

Source: Cork County Council public planning register / official file linked

Cork County Council / 25/5194 / 2026-05-27

Newmarket, Cork

Permission for the construction and operation of a 20-bedroom residential care home, the construction of a storage shed, electrical substation, switch room, service yard, covered storage area and enclosure; the demolition of existing agricultural sheds and ...

Stage
Commencement
Est. value band
EUR 1m-3m
Applicant
Nua Healthcare Services
Units / floor
units unknown / 1705 m2
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
not available yet
EnergyH&S triggerInfrastructureGoing to site

Source: Owner-supplied commencement export / official file linked

Cork County Council / 25/368 / 2026-06-01

Baltimore, Cork

Construction of dwelling house, access road, wastewater treatment plant and all associated site development works

Stage
Commencement
Est. value band
EUR 250k-500k
Applicant
not available yet
Units / floor
1 unit / 203 m2
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
not available yet
H&S triggerInfrastructureGoing to sitesource=commencement

Source: Owner-supplied commencement export / official file linked

Permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (0.42 ha) Blarney Business Park, Clogheenmilcon, Blarney, Co. Cork. The site is generally bound to the west by the Blarney Business Park access road; ...

Stage
New Application
Applicant
Electricity Supply Board (ESB)
Units / floor
2 units / floor unknown (units estimated)
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
Maria Rochford
EnergyH&S triggerInfrastructure