Commencement notice group
Commencement notices — Ballyconnell
Ballyconnell, Cavan
1 separate notice · latest notified commencement 01 Mar 2023 · planning basis not stated
- Source notices
- 1
- Latest notified commencement
- 01 Mar 2023
- Latest notice
- 1,193 m²
- Planning references supplied
- None stated
- Public location
- Ballyconnell, Cavan
Public source geography
Site location
- Public site / locality
- Ballyconnell, Cavan
- County
- Cavan
Public site labels seen across the notices
- ground floor level
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No public planning-file or drawings link is currently indexed for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
At ground floor level; the re-configuration allows for the reduction in size of the Existing Male Changing Room, and provision of public Male and Female Toilets and Disable toilets and provision of a 5 Peron lift located in the main foyer next to the main stairs which will give vertical access throughout the building. At first floor there is a pressing need to increase the size and functionality of the existing kitchen to serve greater food demand. In doing this, toilets have been relocated as one would enter the Restaurant to the right hand side next to the Kitchen and the Restaurant is being generally refurbished.
1,193 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.