New build
15 Oct 2020 · Latest notice
3 notices · phased
Dunshaughlin, Meath · Meath County Council · Planning ref DA/120987
Phase 2 of development at Dunshaughlin and all associated site works, commencing as part of 142 No. dwellings plus associated outdoor play area's and public park.
Notice-stated scale
78 units · 8,602.9 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0005877MH BCMS open-data feed
Construction of single storey creche and all associated site works, commencing as part of development granted under ABP Order ref: ABP PL.17.241988
265 m²Builder not named
15 Oct 2020
CN0051198MH BCMS open-data feed
Phase 2 of development at Dunshaughlin and all associated site works, commencing as part of 142 No. dwellings plus associated outdoor play area's and public park.
78 units · 8,602.9 m²Builder not named
26 Apr 2019
CN0039116MH BCMS open-data feed
Phase 1 of development at Dunshaughlin and all associated site works, commencing as part of 142 No. dwellings plus associated outdoor play area's and public park.
64 units · 7,362.5 m²Builder not named
09 May 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Sep 2020 · Latest notice
2 notices · phased
Oldtown, Swords, Dublin · Fingal County Council · Planning ref F18A/0410
Construction of 54 houses: Nos. 76 to 88 (even) Miller's Avenue, Nos. 2 to 12 (even) Westmill Row, Nos. 2 to 16 (even)& Nos. 33 to 49 (odd) Westmill Place, Nos. 1 to 21 (continuous) Westmill Green, Nos. 1 & 2 Westmill Lane, No. 7 Glen Ellan Road
Notice-stated scale
54 units · 6,210 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0068725FL BCMS open-data feed
Construction of 54 houses: Nos. 76 to 88 (even) Miller's Avenue, Nos. 2 to 12 (even) Westmill Row, Nos. 2 to 16 (even)& Nos. 33 to 49 (odd) Westmill Place, Nos. 1 to 21 (continuous) Westmill Green, Nos. 1 & 2 Westmill Lane, No. 7 Glen Ellan Road
54 units · 6,210 m²Builder not named
24 Sep 2020
CN0067188FL BCMS open-data feed
The construction of 10 houses: Nos. 70, 72, 74 Millers Avenue, Nos. 40 to 50 (even) Park Avenue and No. 2 Scholars Row, Millers Glen, Oldtown, Swords, Co. Dublin.
10 units · 1,167 m²Builder not named
17 Aug 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Sep 2020 · Latest notice
2 notices · phased
Tralee, Kerry · Kerry County Council · Planning ref Part 8 16.07.2019
22 No. Semi- Detached Two Storey Dwellings at Croogorts Tralee Co Kerry for Kerry Co. Co. i.e - 2 No Type 1(Mirrored Options) 2 bed 4 person,1 No. Type 3- 4 bed 7 person, 10 no. type B, 1 no. type 1C 2/bed 4 person Corner, 4 no. Type 2-3 bed 5 person, 2 no. type 1 - 2/bed 4 person, 1 no. type 1C 2/bed 4 person, i no. Type 3 3 bed 5 person, tpgether with all ancilliary site works and Services
Notice identity Works stated Scale Commenced
CN0068440KY BCMS owner-supplied export
22 No. Semi- Detached Two Storey Dwellings at Croogorts Tralee Co Kerry for Kerry Co. Co. i.e - 2 No Type 1(Mirrored Options) 2 bed 4 person,1 No. Type 3- 4 bed 7 person, 10 no. type B, 1 no. type 1C 2/bed 4 person Corner, 4 no. Type 2-3 bed 5 person, 2 no. type 1 - 2/bed 4 person, 1 no. type 1C 2/bed 4 person, i no. Type 3 3 bed 5 person, tpgether with all ancilliary site works and Services
22 units · 2,022.7 m²Builder named
24 Sep 2020
CN0069641KY BCMS owner-supplied export
Detached two- Storey Building Comprised of 4 No. 1 Bed Apartments (Units 5 to 8 inclusive), 2 at Ground Floor and 2 at First Floor Level, and Associated Site Works at Croogorts, Tralee, Co. Kerry for Kerry County Council
4 units · 247 m²Builder named
21 Sep 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
16 Sep 2020 · Commenced
1 notice · 1 source identity
Tralee, Kerry · Kerry County Council
Construction of A development of 53 houses consisting of 38 No. Semi- detached 2 storey dwellings, 15 no. terraced 2 storey dwellings, and an apartment block of 8 no 1bed/2 person apartments, all of traditional construction to form a new housing estate.
New build
07 Sep 2020 · Latest notice
2 notices · phased
Killester, Dublin · Dublin City Council · Planning ref 3930/18
Construction of 60 apartments, Block 2 and 3, Brookwood Court, St. Brigid's Road, Killester, Dublin 5
Notice-stated scale
60 units · 5,944 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0067813DC BCMS open-data feed
Construction of 4 No. 3-bedroom, two -storey terrace dwellings and change of use to the existing two storey former Holy Faith Convent building from institutional/convent use to residential use comprising a total of 11 no. units(Block 1), St. Brigid's Road, Killester, Dublin 5.
15 units · 580 m²Builder not named
07 Sep 2020
CN0061367DC BCMS open-data feed
Construction of 60 apartments, Block 2 and 3, Brookwood Court, St. Brigid's Road, Killester, Dublin 5
60 units · 5,944 m²Builder not named
10 Feb 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 Aug 2020 · Latest notice
2 notices · phased
Dublin 9, Dublin · Dublin City Council · Planning ref ABP-303296-18
7-Day Notice - Griffith Wood Phase 1. Including 6 Blocks over Shared Basement, 342 no. apartments with all associated site works at Griffith Wood, Griffith Avenue, Dublin 9.
Notice-stated scale
342 units · 44,331.1 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0005495DC BCMS open-data feed
It is proposed to construct a Substation Building for the new Griffith Wood Residential Development, Griffith Avenue, Dublin 9. This will consist of the ESB substation and two LV switch rooms.
61.7 m²Builder not named
25 Aug 2020
SN0004478DC BCMS open-data feed
7-Day Notice - Griffith Wood Phase 1. Including 6 Blocks over Shared Basement, 342 no. apartments with all associated site works at Griffith Wood, Griffith Avenue, Dublin 9.
342 units · 44,331.1 m²Builder not named
06 Aug 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Aug 2020 · Latest notice
2 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref ABP 304686 - SHD0011/19
We propose to carry out Phase 2 of 2 which will consist of a residential development consisting of 153 no. residential units and associated site works.( Phase 1 Preparation works carried out under CN 8446962 /CN0066312DC)
Notice-stated scale
153 units · 14,142 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0005480DC BCMS open-data feed
We propose to carry out Phase 2 of 2 which will consist of a residential development consisting of 153 no. residential units and associated site works.( Phase 1 Preparation works carried out under CN 8446962 /CN0066312DC)
153 units · 14,142 m²Builder not named
17 Aug 2020
CN0066312DC BCMS open-data feed
"We propose to carry out Phase 1 of 2 which will include Preparation Works for the above referenced apartment development . The Preparation Works will consist of general site clearance including removal of approx. 1.0m depth of soil from the site, forming site access, site set up and construction of boundary walls to secure the perimeter of the site, all as permitted in the Planning Decision ( ABP 304686 19)". In conjunction with Dublin City Council and Dublin Bus the existing Footpath, Cycle Lane, Bus Lane and nearside carriageway will be closed for a single day and a temporary Footpath, Cycle Lane and Bus Stop will be installed as per drawing. A 1.2-Metre wide Temporary Walkway will be installed and demarked by Pedestrian Barriers on both sides of the walkway with additional Traffic Cones installed on the Barriers facing the Cycle Lane. A Traffic island will be formed to filter traffic into a single carriageway and provide segregation between vehicular traffic and cyclists. Standard Roadworks Signage will be installed warning and guiding Drivers, Cyclists and Pedestrians. The Preparation Works will involve the removal of kerbstones, lowering of the pavement for vehicle access, installation of kerbstones, removal of railings and the opening of the Boundary Wall. Hoarding and Site Gates will be installed and all other site access work activities will be undertaken within the Site Boundary.
1 unit · 1 m²Builder not named
14 Jul 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
05 Aug 2020 · Latest notice
2 notices · phased
Allenwood, Kildare · Kildare County Council · Planning ref 17120
(Phase 1)of a development comprising of 10 No.Two Storey Houses at Allenwood Middle, Allenwood ,Co, Kildare
Notice identity Works stated Scale Commenced
CN0066741KE BCMS owner-supplied export
Construction of 12 no. semi-detached houses, consisting of numbers 26-37 inclusive
12 units · 1,896 m²Builder named
05 Aug 2020
CN0062510KE BCMS owner-supplied export
(Phase 1)of a development comprising of 10 No.Two Storey Houses at Allenwood Middle, Allenwood ,Co, Kildare
22 units · 1,223 m²Builder named
09 Mar 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Jul 2020 · Latest notice
3 notices · phased
Dublin 15, Dublin · Fingal County Council · Planning ref FW18A/0132
Commencement of house units 22-49 , 53-56 Hollywoodrath Green and 27-30, 33-38 Hollywoodrath Drive, Hollywoodrath Hollystown, Dublin 15.
Notice identity Works stated Scale Commenced
CN0066419FL BCMS open-data feed
Commencement of house units 22-49 , 53-56 Hollywoodrath Green and 27-30, 33-38 Hollywoodrath Drive, Hollywoodrath Hollystown, Dublin 15.
42 units · 5,325.6 m²Builder not named
24 Jul 2020
CN0061719FL BCMS owner-supplied export
Commencement of house units 1-3 & 18-21 Hollywoodrath Place, and 62-67 Hollywoodrath Drive, Hollywoodrath Hollystown, Dublin 15.
474 units · 1,585.4 m²Builder named
18 Feb 2020
CN0057798FL BCMS open-data feed
Commencement of house units 1 to 23 Hollywoodrath Close, 4 to 17 Hollywoodrath Place, 1 to 21, 57 and 58 Hollywoodrath Green.
60 units · 7,248.9 m²Builder not named
14 Oct 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
05 Jun 2020 · Latest notice
4 notices · phased
Dublin, Dublin · Fingal County Council · Planning ref FW17A/0234
Construction of 113 Houses and associated site works at St Josephs, Hansfield, Dublin 15
Notice-stated scale
113 units · 13,585.1 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0005314FL BCMS open-data feed
Construction of 4 storey Apartment Block, consisting of 22 No. Units, internal common Areas and all associated site development works at Block 03, St Josephs Grove (No's 16-37 inclusive) Hansfield, Dublin 15.
22 units · 2,061 m²Builder not named
05 Jun 2020
SN0005024FL BCMS open-data feed
Construction of 4 storey Apartment Block, consisting of 10 No. Units, internal common Areas and all associated site development works at Block 01, St Josephs Crescent (No's 21,22,23,24,25,26,27,28,29,30) Hansfield, Dublin 15.
10 units · 907 m²Builder not named
15 Jan 2020
SN0005025FL BCMS open-data feed
Construction of 4 storey Apartment Block, consisting of 12 No. Units, internal common Areas and all associated site development works at Block 04, St Josephs Crescent (No's 1,2,3,4,5,6,7,8,9,10,11,12) Hansfield, Dublin 15.
12 units · 1,012 m²Builder not named
15 Jan 2020
CN0052522FL BCMS open-data feed
Construction of 113 Houses and associated site works at St Josephs, Hansfield, Dublin 15
113 units · 13,585.1 m²Builder not named
03 Jun 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
01 Jun 2020 · Latest notice
3 notices · phased
Dublin, Dublin · South Dublin County Council · Planning ref SD16A/0060
CONSTRUCTION OF A NEW THREE STOREY RESIDENTIAL DEVELOPMENT OVER GROUND FLOOR COMMERCIAL UNITS
Notice identity Works stated Scale Commenced
CN0064475SD BCMS open-data feed
Fitting out of small supermarket in a commercial development at St. James Rd. & Limekiln Green, Greenhills, Dublin 12
560 m²Builder not named
01 Jun 2020
SN0003725SD BCMS open-data feed
CONSTRUCTION OF A NEW THREE STOREY RESIDENTIAL DEVELOPMENT OVER GROUND FLOOR COMMERCIAL UNITS
26 units · 8,816 m²Builder not named
26 Nov 2018
CN0041164SD BCMS owner-supplied export
Demolition of existing structures and construction of part boundary wall.
1,195 m²Builder named
09 Jul 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 May 2020 · Latest notice
4 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref 3791/18
The development will include 48 no. two and three storey houses, comprising semi-detached and terraced units and all associated site development works roads and services at Parkside, Balgriffin, Dublin 17.
Notice-stated scale
48 units · 124,285 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0064422DC BCMS open-data feed
The development will include 16 no. two and three storey houses, comprising semi-detached and terraced units and all associated site development works roads and services at Parkside, Balgriffin, Dublin 17.
16 units · 28,672 m²Builder not named
27 May 2020
CN0064173DC BCMS open-data feed
The development will include 48 no. two and three storey houses, comprising semi-detached and terraced units and all associated site development works roads and services at Parkside, Balgriffin, Dublin 17.
48 units · 124,285 m²Builder not named
25 May 2020
SN0005293DC BCMS open-data feed
Residential development comprising of duplex Block A - 16 dwelling units, 25-40 Walker Grove, all associated site development works roads and services at Parkside, Balgriffin, Dublin 17.
16 units · 1,745 m²Builder not named
22 May 2020
SN0005292DC BCMS open-data feed
Residential development comprising of duplex Block B - 16 dwelling units, 09-24 Walker Grove, all associated site development works roads and services at Parkside, Balgriffin, Dublin 17.
16 units · 1,745 m²Builder not named
21 May 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 May 2020 · Latest notice
4 notices · phased
Limerick, Limerick · Limerick City and County Council · Planning ref 188007
a residential development comprising 31 No. houses (No's 202-206, 209-213, 216-223, 226-229, 232-236 & 239-242)and all associated site works.
Notice identity Works stated Scale Commenced
CN0064049LL BCMS owner-supplied export
a residential development comprising 31 No. houses (No's 202-206, 209-213, 216-223, 226-229, 232-236 & 239-242)and all associated site works.
31 units · 1,518.4 m²Builder named
07 May 2020
SN0005261LL BCMS open-data feed
a residential development comprising 1 no. residential Duplex units (Apartments 243-244) and all associated site works.
1 unit · 180 m²Builder not named
30 Apr 2020
SN0005262LL BCMS open-data feed
a residential development comprising 4 no. residential duplex units and all associated site works (Apartment Units 207-208, 214-215, 224-225, 230-231)
4 units · 917 m²Builder not named
30 Apr 2020
SN0005263LL BCMS open-data feed
a residential development comprising 1 no. residential Duplex unit (Apartments 200-201) and all associated site works.
1 unit · 180 m²Builder not named
30 Apr 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
06 May 2020 · Latest notice
2 notices · phased
Ardfert, Kerry · Kerry County Council · Planning ref 18/1220
Construction of 30 dwellings and associated site works.
Notice identity Works stated Scale Commenced
CN0064008KY BCMS owner-supplied export
Construction of 30 dwellings and associated site works.
30 units · 2,557.8 m²Builder named
06 May 2020
CN0052736KY BCMS owner-supplied export
Construction of 12 Dwelling Houses and associated site works
12 units · 1,023.1 m²Builder not named
11 Jun 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
16 Apr 2020 · Latest notice
3 notices · phased
Carrigrohane, Cork · Cork City Council · Planning ref 16/05342 and 18/07318
Construction of Residential Units 1 to 23 at Reldare Model Farm Road Cork Phase 1
Notice-stated scale
23 units · 80,104.4 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0063926CY BCMS open-data feed
Construction of Residential units 33 to 48 Reldare Model Farm Road Carrigrohane Phase 3
16 units · 40,230.4 m²Builder not named
16 Apr 2020
CN0061196CY BCMS open-data feed
Construction of Residential Units 24 to 32 Reldare Model Farm Road Carrigrohane Phase 2
9 units · 14,880.7 m²Builder not named
10 Feb 2020
CN0050769CC BCMS open-data feed
Construction of Residential Units 1 to 23 at Reldare Model Farm Road Cork Phase 1
23 units · 80,104.4 m²Builder not named
25 Apr 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Apr 2020 · Latest notice
4 notices · phased
Naas, Kildare · Kildare County Council · Planning ref 15/176
Phase 2 was previously noted as a four-phase development with 160 number houses under the valid Commencement Notice No. 8416848. Phase 2 has been revised to a six phased development consisting of a total of 164 number houses (12 No. Type A1, three bedroom, two-storey terraced houses, 48 No. Type B1, three bedroom, two-storey semi-detached houses, 58 No. Type C, four bedroom, two-storey semi-detached houses, 14 No. Type D/H, four bedroom, two-storey detached houses, 20 No. Type FS/H, four bedroom, two-storey detached houses, 12 No. Type G, consisting of 8 no. 1 bed apartments and 4 no. 2 bed townhouses). 2 No. electricity substation, associated public open space, landscaping, roads, parking and infrastructure, accessed off the Blessington Road, Craddockstown, Naas, County Kildare. Construction of Phase 2E (fifth phase of this six phased development) consists of a total of 23 number houses (4 No. Type A, three bedroom two-storey terrace houses, 4 No. Type B, three bedroom, two-storey semi-detached houses, 6 No. Type C, four bedroom, two-storey semi-detached houses, 3 No. Type D four bedroom two-storey detached houses, 1 No. Type D/H four bedroom two-storey detached houses, 1 No. Type Fr, four bedroom, two-storey detached houses, 1 No. Type Fr/H, four bedroom, two-storey detached houses, 1 No. Type Fs, four bedroom, two-storey detached houses, 2 No. Type Fs/H, four bedroom, two-storey detached houses). Associated public open space, landscaping, roads, parking and infrastructure, accessed off the Blessington Road, Craddockstown, Naas, County Kildare.
Notice-stated scale
123 units · 49,151.5 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0063662KE BCMS open-data feed
Phase 2 was previously noted as a four-phase development with 160 number houses under the valid Commencement Notice No. 8416848. Phase 2 has been revised to a six phased development consisting of a total of 164 number houses (12 No. Type A1, three bedroom, two-storey terraced houses, 48 No. Type B1, three bedroom, two-storey semi-detached houses, 58 No. Type C, four bedroom, two-storey semi-detached houses, 14 No. Type D/H, four bedroom, two-storey detached houses, 20 No. Type FS/H, four bedroom, two-storey detached houses, 12 No. Type G, consisting of 8 no. 1 bed apartments and 4 no. 2 bed townhouses). 2 No. electricity substation, associated public open space, landscaping, roads, parking and infrastructure, accessed off the Blessington Road, Craddockstown, Naas, County Kildare. Construction of Phase 2E (fifth phase of this six phased development) consists of a total of 23 number houses (4 No. Type A, three bedroom two-storey terrace houses, 4 No. Type B, three bedroom, two-storey semi-detached houses, 6 No. Type C, four bedroom, two-storey semi-detached houses, 3 No. Type D four bedroom two-storey detached houses, 1 No. Type D/H four bedroom two-storey detached houses, 1 No. Type Fr, four bedroom, two-storey detached houses, 1 No. Type Fr/H, four bedroom, two-storey detached houses, 1 No. Type Fs, four bedroom, two-storey detached houses, 2 No. Type Fs/H, four bedroom, two-storey detached houses). Associated public open space, landscaping, roads, parking and infrastructure, accessed off the Blessington Road, Craddockstown, Naas, County Kildare.
23 units · 34,458.6 m²Builder not named
13 Apr 2020
CN0059066KE BCMS open-data feed
Construction of Phase 2D (fourth phase of this five phased development) consists of a total of 28 number houses (7 No. Type B1, three bedroom, two-storey semi-detached houses, 2 No. Type Fs, four bedroom, two-storey detached houses, 2 No. Type A, three bedroom two-storey 4 No. unit terrace houses, 1 No. Type Fr/H, four bedroom, two-storey detached houses, 1 No. Type Fr, four bedroom, two-storey detached houses, 1 No. Type Fs/H, four bedroom, two-storey detached houses, 1 No. Type D/H four bedroom two-storey detached houses). Associated public open space, landscaping, roads, parking and infrastructure, accessed off the Blessington Road, Craddockstown, Naas, County Kildare.
28 units · 49,151.5 m²Builder not named
18 Nov 2019
CN0045641KE BCMS open-data feed
Construction of Phase 2A of a four-phase development. Consisting of a total of 40 number houses to Phase 2A (18 No. Type B1, three bedroom, two-storey semi-detached houses, 6 No. Type FS, four bedroom, two-storey detached houses, 15 No. Type C, four bedroom, two-storey semi-detached houses, 1 No. Type D/H, four bedroom, two-storey detached house. Associated public open space, landscaping, roads, parking and infrastructure, accessed off the Blessington Road, Craddockstown, Naas, County Kildare.
40 units · 6,352.8 m²Builder not named
05 Nov 2018
CN0024712KE BCMS open-data feed
Construction of a total of 284 number houses (40 number Type A1, three bedroom, two-storey terraced houses, 128 number Type B1, three bedroom, two-storey semi-detached houses with an optional fourth bedroom in developed roofspace, 19 number Type B2, three bedroom, two-storey semi-detached houses with an optional fourth bedroom in developed roofspace, 19 number Type B3, three bedroom, two-storey semi-detached houses with an optional fourth bedroom in developed roofspace, 48 number Type C1, four bedroom, two-storey semi-detached houses, three number Type C2, four bedroom, two-storey semi-detached houses, three number Type C3, four bedroom, two-storey semi-detached houses, 12 number Type D1, four bedroom, two-storey detached houses, eight number Type D2, four bedroom, two-storey detached houses, four number Type E, two bedroom, single storey semi-detached houses), two number electricity substations, associated public open space, landscaping, roads, parking and infrastructure, accessed off the Blessington Road, Oak Glade and Oak Glade Close, Craddockstown, Naas, County Kildare.
123 unitsBuilder not named
06 Mar 2017
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Mar 2020 · Latest notice
4 notices · phased
Cabinteely, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D15A/0385
House 31 to 83 Beechpark, Cabinteely, Dublin 18
Notice-stated scale
143 units · 367,820 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0063225DR BCMS open-data feed
House 31 to 83 Beechpark, Cabinteely, Dublin 18
53 units · 367,820 m²Builder not named
30 Mar 2020
SN0004757DR BCMS open-data feed
Construction of two apartment buildings over a common lower ground floor level carpark and services area.
143 units · 17,031.5 m²Builder not named
21 Oct 2019
CN0051894DR BCMS open-data feed
House 1 to 30 Beechpark, Cabinteely, Dublin 18
30 units · 117,840 m²Builder not named
14 May 2019
CN0049452DR BCMS owner-supplied export
Enabling works for development including demolition of 10 no. houses
143 units · 112 m²Builder not named
11 Mar 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Mar 2020 · Latest notice
4 notices · phased
Kilmartin / Tyrellstown, Dublin · Fingal County Council · Planning ref FW13A/0088/E1
Construction of 67 No. 3 Storey Dwellings at sites 2-35 The Avenue, 6-13 The Wood, 24-33 The Green and 19-33 The Crescent, at development to be Know as Bellingsmore, Church Road, Kilmartin, Tyrellstown, Dublin 15.
Notice-stated scale
67 units · 9,553 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0062949FL BCMS open-data feed
Construction of 67 No. 3 Storey Dwellings at sites 2-35 The Avenue, 6-13 The Wood, 24-33 The Green and 19-33 The Crescent, at development to be Know as Bellingsmore, Church Road, Kilmartin, Tyrellstown, Dublin 15.
67 units · 9,553 m²Builder not named
17 Mar 2020
CN0061287FL BCMS open-data feed
Construction of 31 No. 3 storey dwellings at sites 1-8 The Close, 4-16 The Drive, 1-5 & 14-17 The Wood, and 1 The Avenue, at a site to be know as Bellingsmore, Church Road, Kilmartin, Tyrellstown, Dublin 15.
31 units · 4,571 m²Builder not named
03 Feb 2020
CN0060103FL BCMS open-data feed
Construction of 27 No. 3 storey Dwellings and 4 No. 2 Storey Dwellings at sites 11-23 The Green and 1-18 The Crescent, at a site to be know as Bellingsmore, Church Road, Kilmartin, Tyrellstown, Dublin 15.
31 units · 4,360 m²Builder not named
20 Dec 2019
CN0059453FL BCMS open-data feed
Construction of 43 No three storey dwellings, together with associated site works at 1-6 Bellingsmore Church Road, 1-10 The Green, 1-3 The Drive, and 1-24 the Walk, at a site to be Know as Bellingsmore, Church Road, Kilmartin, Tyrrelstown,Dublin 15.
43 units · 6,508 m²Builder not named
22 Nov 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Mar 2020 · Latest notice
2 notices · phased
Carlow, Carlow · Carlow County Council · Planning ref 18/469
Construct 22no. dwellings(3no blocks).A & C to each consist of 5no. units (4 no.2-storey 3-bed townhouses & 1 no. 2-storey 4-bed townhouse. Block B to consist of 12 no.units in a 3-storey block (6no. 3-bed duplex aprt over 6no. 2-bed aprt)
Notice-stated scale
22 units · 26,520.6 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0062338CW BCMS open-data feed
Construct 22no. dwellings(3no blocks).A & C to each consist of 5no. units (4 no.2-storey 3-bed townhouses & 1 no. 2-storey 4-bed townhouse. Block B to consist of 12 no.units in a 3-storey block (6no. 3-bed duplex aprt over 6no. 2-bed aprt)
22 units · 26,520.6 m²Builder not named
04 Mar 2020
CN0060911CW BCMS open-data feed
Site Clearance, Site Investigation and Enabling Works comprising of excavations to construct concrete piles to foundations for all 3No. blocks, in advance of separate full BCAR Commencement Notice with Documentation for all building works to development.
Scale not statedBuilder not named
27 Jan 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Mar 2020 · Latest notice
4 notices · phased
Dublin 1, Dublin · Dublin City Council · Planning ref DSDZ2464/19
Blocks 3DE and 3E2 – Construction works from Ground Floor to level 5. The works involve permanent piling, concrete works, associated underground works and Fit Out works to facilitate a Residential Development forming part of Coopers Cross development at Dublin Docklands Note: The works above Level 5 will be subject of a separate Commencement Notice.
Notice-stated scale
277 units · 28,144 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0062141DC BCMS open-data feed
Blocks 3DE and 3E2 – Construction works from Ground Floor to level 5. The works involve permanent piling, concrete works, associated underground works and Fit Out works to facilitate a Residential Development forming part of Coopers Cross development at Dublin Docklands Note: The works above Level 5 will be subject of a separate Commencement Notice.
117 units · 9,484.4 m²Builder not named
02 Mar 2020
CN0062054DC BCMS open-data feed
Blocks 3A1/3A2 and B – Construction works from Basement to level 5. The works involve permanent piling, concrete works, associated underground works and Fit Out works to facilitate a Residential Development forming part of Coopers Cross development at Dublin Docklands.” Note: The above ground works and Fit Out of the Basement will be subject of a separate Commencement Notice.
277 units · 28,144 m²Builder not named
26 Feb 2020
CN0056617DC BCMS owner-supplied export
Residential Development forming part of Coopers Cross Residential development at the Dublin Docklands. The works involve a contiguous piled wall (associated with Blocks 3A1/3A2 and B), a bulk dig and the installation of a retaining wall (associated with the Mews Houses) and works to the existing below ground services as may be required to facilitate the enabling works on site at 165-182 Sheri? St Upper, Dublin 1.
Scale not statedBuilder not named
17 Sep 2019
CN0056225DC BCMS open-data feed
Proposed Residential Development forming part of City Block 3 development at Dublin Docklands. These works consist of demolition & site clearance dig at 165-182 Sheriff St Upper, Dublin 1
Scale not statedBuilder not named
02 Sep 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 Feb 2020 · Latest notice
2 notices · phased
Hansfield, Dublin · Fingal County Council · Planning ref FW18A/0197
At 1-18, 33-98 & 101-109 Barnwell Park & 42-54 Station Road, the construction of 106 no. houses in detached, semi-detached and terraced form. 1 no. is 3-storey, while 105 no. are 2-storey. All are of masonry construction with concrete ground floors and tiled pitched roofs.
Notice-stated scale
106 units · 11,695 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0005150FL BCMS open-data feed
The construction of one 2-storey detached creche building of masonry construction and tiled pitched roof.
276 m²Builder not named
27 Feb 2020
CN0060193FL BCMS open-data feed
At 1-18, 33-98 & 101-109 Barnwell Park & 42-54 Station Road, the construction of 106 no. houses in detached, semi-detached and terraced form. 1 no. is 3-storey, while 105 no. are 2-storey. All are of masonry construction with concrete ground floors and tiled pitched roofs.
106 units · 11,695 m²Builder not named
18 Dec 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Feb 2020 · Latest notice
3 notices · phased
Bettystown, Meath · Meath County Council · Planning ref LB/151268
57 Two Storey Dwellings at 31-35 The Dale, 8-36 The Grove, 14-36 The Avenue, Whitefield Hall, Bettystown, County Meath.
Notice-stated scale
79 units · 9,906 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0061960MH BCMS open-data feed
57 Two Storey Dwellings at 31-35 The Dale, 8-36 The Grove, 14-36 The Avenue, Whitefield Hall, Bettystown, County Meath.
57 units · 7,255 m²Builder not named
20 Feb 2020
CN0050303MH BCMS open-data feed
79 Two Storey Dwellings at 1-13 The Avenue, 1-7 The Grove, 1-30 The Dale, 1-29 The Lawn, Whitefield Hall, Bettystown, Co. Meath.
79 units · 9,906 m²Builder not named
05 Apr 2019
CN0024466MH BCMS open-data feed
Completion of existing Whitefield Manor housing development under new planning permission.
51 unitsBuilder not named
06 Feb 2017
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
19 Feb 2020 · Latest notice
2 notices · phased
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP-304682-19
Construction of a new building Haliday House (Blocks 3A & 3B) superstructure Cores 1 - 6 which includes 182 no. apartments, concierge, communal areas, landscaped courtyard and basement car park including ancillary accommodation and all associated site development works.
Notice-stated scale
186 units · 15,860 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0005124DR BCMS open-data feed
Construction of a new building Haliday House (Blocks 3A & 3B) superstructure Cores 1 - 6 which includes 182 no. apartments, concierge, communal areas, landscaped courtyard and basement car park including ancillary accommodation and all associated site development works.
182 units · 15,653 m²Builder not named
19 Feb 2020
SN0004976DR BCMS open-data feed
Construction of a new building Cheevers Court (Blocks 2A & 2B) superstructure Cores 1 - 6 which includes 186 no. apartments, concierge, communal areas, landscaped courtyard and basement car park including ancillary accommodation and all associated site development works.
186 units · 15,860 m²Builder not named
02 Jan 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Feb 2020 · Latest notice
2 notices · phased
Portlaoise, Laois · Laois County Council · Planning ref 10396 15338 19144
36 HOUSE DEVELOPMENT
Notice identity Works stated Scale Commenced
CN0061306LS BCMS owner-supplied export
36 HOUSE DEVELOPMENT
36 units · 1,752 m²Builder named
17 Feb 2020
CN0061060LS BCMS open-data feed
36 HOUSE DEVELOPMENT
18 units · 2,091 m²Builder not named
30 Jan 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Feb 2020 · Latest notice
2 notices · phased
Drogheda, Meath · Meath County Council · Planning ref LB170675
Construction of 50 No. dwellings including infrastructure works at Rathmullan Road, Drogheda, Co.Meath
Notice-stated scale
90 units · 10,321 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0061715MH BCMS open-data feed
Construction of 50 No. dwellings including infrastructure works at Rathmullan Road, Drogheda, Co.Meath
50 units · 5,783.4 m²Builder not named
17 Feb 2020
CN0057175MH BCMS open-data feed
Construction of 90 No. dwellings including infrastructure works at Rathmullan Road, Drogheda, Co.Meath
90 units · 10,321 m²Builder not named
24 Sep 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.