Commencement notice group

Housing commencement notices — Walkinstown

Dublin, Dublin

2 unique commencement events · latest notified commencement 17 Aug 2020 · planning reference supplied

Unique commencement events
2
Latest notified commencement
17 Aug 2020
Latest notice
153 units
Planning references supplied
304686
Public location
Dublin, Dublin

Public source geography

Site location

Public site / locality
Dublin, Dublin
County
Dublin

Public site labels seen across the notices

  • Walkinstown, Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0005480DC BCMS open-data feed

We propose to carry out Phase 2 of 2 which will consist of a residential development consisting of 153 no. residential units and associated site works.( Phase 1 Preparation works carried out under CN 8446962 /CN0066312DC)

Work stated for this notice 153 units Explicit phase quantity stated by the source.

Floor area stated for this source: 14,142 m².

Planning reference 304686
CN0066312DC BCMS open-data feed

"We propose to carry out Phase 1 of 2 which will include Preparation Works for the above referenced apartment development . The Preparation Works will consist of general site clearance including removal of approx. 1.0m depth of soil from the site, forming site access, site set up and construction of boundary walls to secure the perimeter of the site, all as permitted in the Planning Decision ( ABP 304686 19)". In conjunction with Dublin City Council and Dublin Bus the existing Footpath, Cycle Lane, Bus Lane and nearside carriageway will be closed for a single day and a temporary Footpath, Cycle Lane and Bus Stop will be installed as per drawing. A 1.2-Metre wide Temporary Walkway will be installed and demarked by Pedestrian Barriers on both sides of the walkway with additional Traffic Cones installed on the Barriers facing the Cycle Lane. A Traffic island will be formed to filter traffic into a single carriageway and provide segregation between vehicular traffic and cyclists. Standard Roadworks Signage will be installed warning and guiding Drivers, Cyclists and Pedestrians. The Preparation Works will involve the removal of kerbstones, lowering of the pavement for vehicle access, installation of kerbstones, removal of railings and the opening of the Boundary Wall. Hoarding and Site Gates will be installed and all other site access work activities will be undertaken within the Site Boundary.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 1 m².

Planning reference 304686

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.