New build
20 Feb 2026 · Latest notice
3 notices · phased
Kilbeggan, Westmeath · Westmeath County Council · Planning ref 24/60346
Construction of 62 no. dwellings comprising of 4 no. 2-bed terrace, 44 no. 3-bed detached, 14 no. 4-bed detached the provision of vehicular & pedestrian connections to abbeybrook along with all associated site works and services.
Notice-stated scale
62 units · 6,881.8 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0138603WH BCMS owner-supplied export
Construction of a Bin and Bike store to abbreybrook Along with all associated site works and services.
51.2 m²Builder not named
20 Feb 2026
CN0137758WH BCMS owner-supplied export
Construction of 1 no. Duplex apartment block comprising of 4 no. 1-bed and 8 no. 2-bed units, the provision of vehicular & pedestrian connections to Abbeybrook along with all associated site works and services.
12 units · 960 m²Builder not named
26 Jan 2026
CN0132108WH BCMS owner-supplied export
Construction of 62 no. dwellings comprising of 4 no. 2-bed terrace, 44 no. 3-bed detached, 14 no. 4-bed detached the provision of vehicular & pedestrian connections to abbeybrook along with all associated site works and services.
62 units · 6,881.8 m²Builder not named
12 Aug 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
19 Feb 2026 · Latest notice
3 notices · phased
Donabate, Dublin · Fingal County Council · Planning ref LADP/001/24
Construction of 123 Two Storey Houses and associated site works at Ballisk Park, New Road, Donabate, Co. Dublin
Notice-stated scale
123 units · 11,749 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0138587FL BCMS open-data feed
Construction of a new Creche (BX01 - Shell and core works only) and associated site works.
364.9 m²Builder not named
19 Feb 2026
SN0011332FL BCMS open-data feed
Construction of a new 3 & 4 storey apartment block containing 52 no. apartments together with associated site works at Ballisk Park Place, New Road, Ballisk, Donabate, Co. Dublin.
52 units · 4,685 m²Builder not named
27 Sep 2024
CN0120388FL BCMS open-data feed
Construction of 123 Two Storey Houses and associated site works at Ballisk Park, New Road, Donabate, Co. Dublin
123 units · 11,749 m²Builder not named
23 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Feb 2026 · Latest notice
2 notices · phased
Tralee, Kerry · Kerry County Council · Planning ref Part 8 11.11.2022
Construction of a Three Storey Apartment block consisting of 27 no units and all associated ancillary site works.
Notice identity Works stated Scale Commenced
CN0138043KY BCMS open-data feed
Construction of a single storey building containing a bin store room and a maintenance equipment store room at Tearmann na nGeanan Apartments.
36 m²Builder not named
04 Feb 2026
CN0123390KY BCMS owner-supplied export
Construction of a Three Storey Apartment block consisting of 27 no units and all associated ancillary site works.
27 units · 1,858.8 m²Builder named
09 Dec 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Feb 2026 · Latest notice
2 notices · phased
Cloch Dhubh, Cork · Cork County Council · Planning ref 23/06606
Construction of 35No. Dwelling houses at No's. 59 to 88 and 94 to 98 pairc Brouen, Cloughduv, Co. Cork.
Notice identity Works stated Scale Commenced
CN0137904CC BCMS owner-supplied export
Construction of 35No. Dwelling houses at No's. 59 to 88 and 94 to 98 pairc Brouen, Cloughduv, Co. Cork.
35 units · 4,401.8 m²Builder named
04 Feb 2026
CN0123504CC BCMS owner-supplied export
Construction of 17 No. Dwelling houses at No's 89 to 93 and 99 to 110 Pairc Brouen, Cloughduv, Co. Cork.
17 units · 2,047.8 m²Builder named
23 Dec 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Feb 2026 · Latest notice
2 notices · phased
Shannon, Clare · Clare County Council · Planning ref 21-1397
Construction of 55 houses and associated site works, Numbers 49-103 inclusive, Radharc Doire, Smithstown, Shannon, Co. Clare.
Notice-stated scale
55 units · 6,438 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0137556CE BCMS owner-supplied export
Construction of a creche facility within the Radharc Doire development Shannon for Galvin Construction.
372 m²Builder not named
02 Feb 2026
CN0110395CE BCMS open-data feed
Construction of 55 houses and associated site works, Numbers 49-103 inclusive, Radharc Doire, Smithstown, Shannon, Co. Clare.
55 units · 6,438 m²Builder not named
29 Feb 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
Material alteration
30 Jan 2026 · Commenced
1 notice · 1 source identity
University of Limerick, Castletroy, Clare · Clare County Council
The installation of cavity barriers to the external elevations of Clover, Orchid & Bluebell House Student Accommodation
Extension Material alteration
27 Jan 2026 · Latest notice
2 notices · phased
Dublin 8, Dublin · Dublin City Council · Planning ref SHD0031/20 (ABP 308917-20)
The development consists of a mixed-use scheme involving change of use, refurbishment, modifications, alterations and additions to the former Player Wills Factory building (PW1) to include a community, arts and cultural exhibition space, artist and photography studios, retail space, café/bar/restaurant space, co-working space, 240 no. single occupancy shared accommodation private living areas, 47 no. build-to rent apartments, associated ancillary services, amenities and facilities, communal amenity outdoor space and a basement to accommodate plant at the Former Player Wills Site South Circular Road Dublin 8
Notice identity Works stated Scale Commenced
CN0137727DC BCMS open-data feed
The development consists of a mixed-use scheme involving change of use, refurbishment, modifications, alterations and additions to the former Player Wills Factory building (PW1) to include a community, arts and cultural exhibition space, artist and photography studios, retail space, café/bar/restaurant space, co-working space, 240 no. single occupancy shared accommodation private living areas, 47 no. build-to rent apartments, associated ancillary services, amenities and facilities, communal amenity outdoor space and a basement to accommodate plant at the Former Player Wills Site South Circular Road Dublin 8
287 units · 17,604 m²Builder not named
27 Jan 2026
CN0135005DC BCMS owner-supplied export
The demolition of all buildings (15,454 sq.m GFA), excluding the original fabric of the former Player Wills Factory (protected structure no. 8796) to facilitate the development of a mixed use scheme at the former Player Wills site, South Circular Road, Donore Ave, Dublin 8
108,178 m²Builder named
28 Oct 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
15 Jan 2026 · Latest notice
3 notices · phased
Kilcoole, Wicklow · Wicklow County Council · Planning ref S179A Application
Construction of 26 housing units and all associated site works.
Notice identity Works stated Scale Commenced
CN0137633WW BCMS owner-supplied export
Construction of 26 housing units and all associated site works.
26 units · 1,628.3 m²Builder named
15 Jan 2026
CN0123492WW BCMS owner-supplied export
Construction of 63 housing units and all associated site works at Lott Lane - Phase 1 & 2
63 units · 3,504 m²Builder named
06 Dec 2024
CN0123787WW BCMS owner-supplied export
Construction of 6 no. apartment buildings (2 units per building) and all associated site works at Lott Lane - Phase 1 & 2
12 units · 74 m²Builder named
06 Dec 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
18 Dec 2025 · Latest notice
2 notices · phased
Saggart, Dublin · South Dublin County Council · Planning ref SD22A/0357
Proposed Residential Building (Blocks C & D), Residential Development, Garter's Lane, Saggart, Co. Dublin, 2 no. proposed residential apartment buildings (Block C & Block D ) over 1 no. connected basement level car park. The proposed residential development is located at Garters Lane, Saggart, Co. Dublin
Notice-stated scale
115 units · 13,330.5 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0013505SD BCMS open-data feed
Proposed Residential Building (Blocks C & D), Residential Development, Garter's Lane, Saggart, Co. Dublin, 2 no. proposed residential apartment buildings (Block C & Block D ) over 1 no. connected basement level car park. The proposed residential development is located at Garters Lane, Saggart, Co. Dublin
115 units · 13,330.5 m²Builder not named
18 Dec 2025
SN0013506SD BCMS open-data feed
Proposed Residential Building (Blocks A & B), Residential Development, Garter's Lane, Saggart, Co. Dublin, 2 no. proposed residential apartment buildings (Block A & Block B ) over 1 no. connected basement level car park. The proposed residential development is located at Garters Lane, Saggart, Co. Dublin
108 units · 12,508.5 m²Builder not named
18 Dec 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
03 Dec 2025 · Latest notice
3 notices · phased
Galway, Galway · Galway County Council · Planning ref 24/60083
61 No dwelling houses at Chreig Bhut, Claregalway, Co Galway permitted under planning reg ref 24/60083
Notice identity Works stated Scale Commenced
SN0013445GC BCMS open-data feed
Construction of a two / three storey duplex block, bin / bike store and all associated site works, unit no’s 62-74 An Móinéar Buí, Cregboy, Claregalway, Co Galway
13 units · 963.2 m²Builder not named
03 Dec 2025
CN0128575GC BCMS owner-supplied export
Detached Garage on site no 9 An Móinéar Buí, Chreig Bhut, Claregalway, Co Galway permitted under planning reg 24/60083
40.1 m²Builder named
15 May 2025
CN0119801GC BCMS open-data feed
61 No dwelling houses at Chreig Bhut, Claregalway, Co Galway permitted under planning reg ref 24/60083
61 units · 7,943.3 m²Builder not named
19 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 Nov 2025 · Latest notice
3 notices · phased
Swords, Dublin · Fingal County Council · Planning ref F22A/0571
Construction of 12 no. House Type A - 4 Bed semi- detached Construction of 10 no. House Type B - 3 Bed semi- detached
Notice identity Works stated Scale Commenced
CN0136201FL BCMS owner-supplied export
Construction of 4 no. semi-detached two-bedroom houses at 18-21 Belvedere View, Type C & C1.
4 units · 393 m²Builder named
25 Nov 2025
CN0105631FL BCMS owner-supplied export
Construction of 12 no. House Type A - 4 Bed semi- detached Construction of 10 no. House Type B - 3 Bed semi- detached
22 units · 2,708 m²Builder named
22 Sep 2023
CN0104929FL BCMS owner-supplied export
Construction of 7no. houses at Belvedere Walk consisting of 6no. semi-detached 2-storey 3-bed houses and 1no. detached 2-storey 3-bed house.
7 units · 884 m²Builder named
31 Aug 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
10 Nov 2025 · Latest notice
4 notices · phased
Millstreet, Cork · Cork County Council · Planning ref Section 179A Granted by Managers Order
The construction of 18 No. Dwellinghouses, 2 No. Apartment Buildings and all associated site works at Páirc Chatháin, Drishane Road, Millstreet, Co. Cork.
Notice identity Works stated Scale Commenced
CN0135381CC BCMS owner-supplied export
The construction of 3 No. Dwelling houses, 1 No. Apartment Buildings and all associated site works at Ceann Scríbe, Clontead Beg, Coachford, Co. Cork.
9 units · 410.4 m²Builder named
10 Nov 2025
CN0124378CC BCMS owner-supplied export
The construction of 16 No. Dwellinghouses, 2 No. Apartment Buildings and all associated site works at Ceann Scríbe, Clontead Beg, Coachford, Co. Cork.
26 units · 1,521.2 m²Builder named
31 Dec 2024
CN0124380CC BCMS owner-supplied export
The construction of 15 No. Dwellinghouses, 6 No. Apartment Buildings and all associated site works at 1 - 35 An Tamhnaigh, Clonakilty, Co. Cork.
35 units · 2,500.0 m²Builder not named
31 Dec 2024
CN0124381CC BCMS owner-supplied export
The construction of 18 No. Dwellinghouses, 2 No. Apartment Buildings and all associated site works at Páirc Chatháin, Drishane Road, Millstreet, Co. Cork.
26 units · 1,420.1 m²Builder named
31 Dec 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
10 Oct 2025 · Latest notice
2 notices · phased
Gorey, Wexford · Wexford County Council · Planning ref ABP 303813/19E & 20220658 & 20231333
Construction of 25 no houses and associated site works, nos. 18-42 (inclusive) Willow Drive, deerpark, fort road gorey.
Notice identity Works stated Scale Commenced
CN0134982WX BCMS owner-supplied export
Construction of 25 no houses and associated site works, nos. 18-42 (inclusive) Willow Drive, deerpark, fort road gorey.
25 units · 3,991 m²Builder named
10 Oct 2025
CN0120035WX BCMS owner-supplied export
Construction of 21 no. new dwelling houses and associated site works, nos. 10-16 larch way, 4-17 maple close, all inclusive, deerpark, fort road, gorey.
21 units · 1,961.8 m²Builder named
20 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Sep 2025 · Latest notice
3 notices · phased
Ardmore, Passage West, Cork · Cork County Council · Planning ref 224692
Construction of nos 1,2,3,4,5,6,7,8,9,10, 11,12,13,14,15,16,1 7,18,19,20,21,22,23 ,24,25,26,27,28,29, 30,31,32,33,34,35,3 6,37 & 38 The Tides, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
Notice-stated scale
44 units · 8,550 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0132767CC BCMS owner-supplied export
Construction of nos 1,2,3,4,5,6,7,8,9,10, 11,12,13,14,15,16,1 7,18,19,20,21,22,23 ,24,25,26,27,28,29, 30,31,32,33,34,35,3 6,37 & 38 The Tides, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
38 units · 8,550 m²Builder not named
04 Sep 2025
CN0111236CC BCMS open-data feed
Construction of Nos 35,36,37,38,39,40,41,42,43,44 Haven Way, 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26 & 30,31,32,33,34,35,36,37 The Gardens, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
44 units · 5,808 m²Builder not named
21 Mar 2024
CN0099920CC BCMS open-data feed
Construction of Nos 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33 & 34 Haven Way, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
34 units · 3,457.8 m²Builder not named
27 Apr 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
28 Jul 2025 · Latest notice
2 notices · phased
Drogheda, Meath · Meath County Council · Planning ref LB200484
PHASE#2A - CONSTRUCTION OF 56no. DWELLINGS AT KESTREL MANOR, PLATIN RD, DROGHEDA, CO.MEATH
Notice-stated scale
56 units · 5,567.9 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0012779MH BCMS open-data feed
Construction of standalone two-storey childcare facility and associated civil works
344.9 m²Builder not named
28 Jul 2025
CN0102864MH BCMS open-data feed
PHASE#2A - CONSTRUCTION OF 56no. DWELLINGS AT KESTREL MANOR, PLATIN RD, DROGHEDA, CO.MEATH
56 units · 5,567.9 m²Builder not named
11 Jul 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Jul 2025 · Latest notice
2 notices · phased
Rathdrum, Wicklow · Wicklow County Council · Planning ref 22-258
Units 66-94, 120-136 (42 Units) at Ardview, Rathdrum, Co. Wicklow
Notice identity Works stated Scale Commenced
CN0131010WW BCMS owner-supplied export
Apt Units 79-82 at Ardview, Rathdrum, Co. Wicklow
8 units · 319.1 m²Builder named
04 Jul 2025
CN0120617WW BCMS open-data feed
Units 66-94, 120-136 (42 Units) at Ardview, Rathdrum, Co. Wicklow
42 units · 5,163.8 m²Builder not named
27 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Jun 2025 · Latest notice
2 notices · phased
Castletroy, Limerick · Limerick City and County Council · Planning ref 2460146, 211152
Construction of 25 Housing units (no's 211 - 235 inclusive) at Newtown Meadows, Castletroy, Co. Limerick
Notice identity Works stated Scale Commenced
CN0129998LL BCMS owner-supplied export
Construction of 16 Housing units (no's 85-100 inclusive) at Newtown Meadows, Castletroy, Co. Limerick
16 units · 1,885.8 m²Builder named
13 Jun 2025
CN0116020LL BCMS owner-supplied export
Construction of 25 Housing units (no's 211 - 235 inclusive) at Newtown Meadows, Castletroy, Co. Limerick
25 units · 2,573.2 m²Builder named
13 Jun 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 May 2025 · Latest notice
4 notices · phased
Bray, Wicklow · Wicklow County Council · Planning ref 211453
Construction of 83 dwellings and associated works. (2-11 The Court, 1-17 The Way, 1-8 The Close, 1-15 The Place, 1-3, 7-14, 37-57 & 61 The Avenue, Kilruddery Demesne, Wicklow)
Notice identity Works stated Scale Commenced
SN0012514WW BCMS open-data feed
Internal layout amendments only to an existing shell and core unit located in an existing creche building
160 m²Builder not named
22 May 2025
CN0102161WW BCMS owner-supplied export
Single Storey Creche (Grey box) Shell & Core Works only and three storey dwelling (1 The Court) and associated works.
1 unit · 316 m²Builder named
15 Jun 2023
CN0101850WW BCMS owner-supplied export
Construction of 2 no. 3 storey apartment buildings (comprising 3 x 1 bed apartments in each building) and associated works. 4-6 & 58-60 The Avenue, Foggie Field, Kilruddery Demesne, Wicklow.
6 units · 340 m²Builder named
02 Jun 2023
CN0102165WW BCMS open-data feed
Construction of 83 dwellings and associated works. (2-11 The Court, 1-17 The Way, 1-8 The Close, 1-15 The Place, 1-3, 7-14, 37-57 & 61 The Avenue, Kilruddery Demesne, Wicklow)
83 units · 8,317 m²Builder not named
01 Jun 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build Extension Material alteration Change of use
07 May 2025 · Latest notice
2 notices · phased
Ballinasloe, Galway · Galway County Council · Planning ref LA-E/04/24
Renovate and extend the existing terraced buildings at Dunlo Hill, including “Dooley’s Pub” (protected structure RPS ref 2730) to create a residential housing development comprising of; 10 no. two-storey one- bed dwelling, 2 no. two-storey two-bed dwelling, 1 no. single-storey one- bed apartment, 1 no. duplex one-bed apartment, 2 no. duplex two-bed apartments (16 no. units in total), as well as the conversion of “Dooley’s Pub” from a public house to a community use.
Notice identity Works stated Scale Commenced
CN0128118GC BCMS owner-supplied export
Renovate and extend the existing terraced buildings at Dunlo Hill, including “Dooley’s Pub” (protected structure RPS ref 2730) to create a residential housing development comprising of; 10 no. two-storey one- bed dwelling, 2 no. two-storey two-bed dwelling, 1 no. single-storey one- bed apartment, 1 no. duplex one-bed apartment, 2 no. duplex two-bed apartments (16 no. units in total), as well as the conversion of “Dooley’s Pub” from a public house to a community use.
16 units · 10,772 m²Builder named
07 May 2025
CN0124561GC BCMS owner-supplied export
Site Enabling works comprising ground exposure and foundations of existing structures in and around a Protected Structure.
2 unitsBuilder named
06 Jan 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Apr 2025 · Latest notice
2 notices · phased
Dungarvan, Waterford · Waterford City and County Council · Planning ref Section 179A
The construction of terraced dwelling units of a 2- phase development of 38 units plus a community Building at Shandon, Dungarvan, Co. Waterford.
Notice identity Works stated Scale Commenced
CN0126891WD BCMS owner-supplied export
The construction of 5 no. apartment blocks plus a Community Building in a 2 phase development at Shandon, Dungarvan, Co. Waterford
16 units · 473 m²Builder named
04 Apr 2025
CN0123828WD BCMS owner-supplied export
The construction of terraced dwelling units of a 2- phase development of 38 units plus a community Building at Shandon, Dungarvan, Co. Waterford.
38 units · 1,534 m²Builder named
20 Dec 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Feb 2025 · Latest notice
3 notices · phased
Mullingar, Westmeath · Westmeath County Council · Planning ref 16/6001
Construction of residential housing development consisting of 25 dwelling units, roads, footpaths and underground services as per granted planning permission Ref: 16/6001 at Irishtown, Mullingar, Westmeath.
Notice-stated scale
25 units · 5,500 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0125680WH BCMS owner-supplied export
To construct 1no. one storey ICF constructed dwelling at 20 Irishtown, Mullingar, Co. Westmeath.
1 unit · 225 m²Builder not named
24 Feb 2025
CN0109300WH BCMS owner-supplied export
Construction of residential housing development consisting of 25 dwelling units, roads, footpaths and underground services as per granted planning permission Ref: 16/6001 at Irishtown, Mullingar, Westmeath.
25 units · 5,500 m²Builder not named
25 Jan 2024
CN0104605WH BCMS owner-supplied export
Construction of two storey residential house including boundary walls, footpaths, driveway, landscaping. Construction of all underground site services (foul, storm, water and power) as per granted planning permission conditions ref: 16/6001 at Irishtown, Mullingar, Co. Westmeath
1 unit · 315 m²Builder not named
25 Aug 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Feb 2025 · Latest notice
4 notices · phased
Dublin 8, Dublin · Dublin City Council · Planning ref ABP-315306-22
The construction of DCC3 forming part of the Donore Project residential development at the former St. Teresa's Gardens, Donore Avenue, Dublin 8. Proposed construction of 6-15 storey apartment block (DCC3) of the Donore Residential Project. The full Donore development also consists of Building DCC6 (ref Commencement Notice 8530177/ CN0123686DC), Buildings DCC5 (ref Commencement Notice 8529306/CN0122677DC) and DCC1 (ref Commencement Notice 8531230). DCC3 is made up of 4 cores ranging from 6-15 storeys providing 247 no. apartments. All residential units provided with associated private balconies/terraces as shown on the supporting drawings. A communal courtyard will be provided at the first floor podium above the car parking. Additionally, Cores A,B & C will be provided with communal roof terraces. The enclosed naturally ventilated ground floor car park contains 37 no. car parking spaces, 2 no. motorbike parking spaces, refuse stores, bike storage and ancillary accommodation including ESB substation, generator, sprinkler tanks, water tanks and LV room. The balance of the ground floor contains the entrances to each residential core, support facilities unit, culture & artist workspaces and café. The support facilities unit, culture & artist workspaces and café shall be completed as a grey box shell and core. The fit outs of that same shall be subject to future FSC applications and Commencement Notices.
Notice-stated scale
247 units · 18,933.2 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0125298DC BCMS open-data feed
The construction of DCC3 forming part of the Donore Project residential development at the former St. Teresa's Gardens, Donore Avenue, Dublin 8. Proposed construction of 6-15 storey apartment block (DCC3) of the Donore Residential Project. The full Donore development also consists of Building DCC6 (ref Commencement Notice 8530177/ CN0123686DC), Buildings DCC5 (ref Commencement Notice 8529306/CN0122677DC) and DCC1 (ref Commencement Notice 8531230). DCC3 is made up of 4 cores ranging from 6-15 storeys providing 247 no. apartments. All residential units provided with associated private balconies/terraces as shown on the supporting drawings. A communal courtyard will be provided at the first floor podium above the car parking. Additionally, Cores A,B & C will be provided with communal roof terraces. The enclosed naturally ventilated ground floor car park contains 37 no. car parking spaces, 2 no. motorbike parking spaces, refuse stores, bike storage and ancillary accommodation including ESB substation, generator, sprinkler tanks, water tanks and LV room. The balance of the ground floor contains the entrances to each residential core, support facilities unit, culture & artist workspaces and café. The support facilities unit, culture & artist workspaces and café shall be completed as a grey box shell and core. The fit outs of that same shall be subject to future FSC applications and Commencement Notices.
247 units · 18,933.2 m²Builder not named
07 Feb 2025
CN0125300DC BCMS open-data feed
The proposed construction of DCC1 forming part of Donore Residential development at the former St. Teresa's Gardens, Donore Avenue, Dublin 8. Proposed construction of 7-storey apartment block (DCC1) of the Donore Residential Project. The full Donore development also consists of Building DCC6 (ref Commencement Notice 8530177/ CN0123686DC), Buildings DCC5 (ref Commencement Notice 8529306/CN0122677DC) and DCC3 (ref Commencement Notice 8531223). DCC1 is made up of 2 cores containing 7 storeys of residential units and communal roof terraces. All residential units provided with associated private balconies/terraces as shown on the enclosed FSC drawings. The top floor height of the habitable accommodation is less than 20m. The development contains open plan apartments provided with a sprinkler system and accessed via a ventilated corridor. A communal courtyard will be provided at the first floor podium above the car parking. The ground floor car park is enclosed naturally ventilated car park with all ancillary accommodation fire separated from the car parking area.
111 units · 10,829.1 m²Builder not named
07 Feb 2025
CN0123686DC BCMS open-data feed
Proposed construction of 7-storey apartment block (DCC5) of the Donore Residential Project. The full Donore development also consists of Building DCC6 (ref Commencement Notice 8529306/CN0122677DC) and Buildings DCC3 and DCC1 which will be subject to their won Commencement Notices in due course. DCC5 is made up of 2 cores containing 7 storeys of residential units and communal roof terraces. All residential units provided with associated private balconies/terraces as shown on supporting drawings. The top floor height of the habitable accommodation is less than 20m. The development contains open plan apartments provided with a sprinkler system and accessed via a ventilated corridor. A communal courtyard will be provided at the first floor podium above the car parking. The ground floor car park is an enclosed naturally ventilated car park with all ancillary accommodation fire separated from the car parking area. A ground floor boxing club and 2 storey creche also forms part of DCC5 which shall be completed to a grey box shell and core standard as part of the proposed works. The fit outs of that same shall be subject to future FSC applications and hence Commencement Notices.
132 units · 12,854.7 m²Builder not named
20 Dec 2024
CN0122677DC BCMS open-data feed
Proposed construction of 7-storey apartment block (DCC6) of the Donore Residential Project including the construction of the stormwater attenuation tank associated with the development which also includes further buildings DCC5, DCC3, and DCC1 which will all be subject to their own Commencement Notices in due course. The proposed development consists of demolition of the existing boundary wall on Margaret Kennedy Road, existing five-a-side playing pitch, and associated fencing and lighting on site; and the construction of a residential development inclusive of 4 no. blocks, namely DCC1, DCC3, DCC5 & DCC6 ranging from 2 no. to 15 no. storeys above ground level. The overall development (GFA of c. 53,227 sqm) contains the following mix of apartments: 225 No. 1 bedroom apartments (36 no. 1-person & 189 no. 2-person), 274 No. 2 bedroom apartments (including 52 No. 2 bed 3 person apartments and 222 No. 2 bed 4 person apartments), 44 No. 3 bedroom 5-person apartments, together with retail/café unit (168 sq.m.), mobility hub (52 sq.m.) and 952 sq.m. of community, artist workspace, arts and cultural space, including a creche, set out in 4 No. blocks. The breakdown of each block will contain the following apartments: • Block DCC1 comprises 111 No. apartments in a block of 6-7 storeys • Block DCC 3 comprises 247 No. apartments in a block of 6-15 storeys • Block DCC5 comprises 132 No. apartments in a block of 2-7 storey • Block DCC6 comprises 53 No. apartments in a block of 7 storeys This Commencement Notice relates to DCC6. The remaining blocks shall be subject to separate future FSC applications and commencement notices. DCC6 is made up of a single core containing 7 storeys of residential units and a communal roof terrace. All residential units provided with associated private balconies/terraces as shown on drawings. A communal courtyard will be provided at the ground floor and roof level. The apartments are approached by either a ventilated lobby or balcony approach as demon
53 units · 5,476.7 m²Builder not named
29 Nov 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
04 Feb 2025 · Latest notice
4 notices · phased
Athy, Kildare · Kildare County Council · Planning ref ABP-318365-23 / 23/656
Construction of 102 Housing Units at Blackparks, Athy, Co. Kildare
Notice identity Works stated Scale Commenced
CN0125093KE BCMS owner-supplied export
Construction of new Creche (Shell and Core only) at Stradowe, Blackparks, Athy, Co. Kildare
195 m²Builder named
04 Feb 2025
CN0120176KE BCMS open-data feed
Construction of 102 Housing Units at Blackparks, Athy, Co. Kildare
102 units · 11,680.2 m²Builder not named
23 Sep 2024
SN0010910KE BCMS open-data feed
Construction of Duplex Blk B (16 Units) at Blackparks, Athy, Co. Kildare
16 units · 1,363.4 m²Builder not named
20 Sep 2024
SN0010911KE BCMS open-data feed
Construction of Duplex Blk A (14 Units) at Blackparks, Athy, Co. Kildare
14 units · 1,190.8 m²Builder not named
20 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Jan 2025 · Latest notice
2 notices · phased
Clongriffin, Dublin · Dublin City Council · Planning ref LRD6064/24-S3
New residential apartment development consisting of residential units disposed around single cores, over a shared central podium courtyard at 1st Floor Level with ground floor level parking under the podium, ground floor retail commercial and ancillary accommodation with 2 No. duplex units accessed from the podium.
Notice-stated scale
270 units · 25,504 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0011983DC BCMS open-data feed
New residential apartment development consisting of residential units disposed around single cores, over a shared central podium courtyard at 1st Floor level with ground floor level parking under the podium, ground floor retail commercial and ancillary accommodation.
270 units · 25,504 m²Builder not named
24 Jan 2025
SN0011984DC BCMS open-data feed
New residential apartment development consisting of residential units disposed around single cores, over a shared central podium courtyard at 1st Floor Level with ground floor level parking under the podium, ground floor retail commercial and ancillary accommodation with 2 No. duplex units accessed from the podium.
138 units · 13,474 m²Builder not named
24 Jan 2025
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Dec 2024 · Latest notice
2 notices · phased
Dunlavin, Wicklow · Wicklow County Council · Planning ref 21/1141
88 no. dwellings consisting of 8 no. 2 bed terraced bungalow dwellings, 10 no. 2 bed semidetached 2 storey dwellings, 4 no. 2 bed terraced 2 storey dwellings, 34 no. 3 bed semidetached 2 storey dwellings, 6 no. 3 bed terraced 2 storey dwellings, 13 no. 3 bed detached 2 storey dwellings. 8 no. 4 bed semidetached 2 storey dwellings & 6 no. 4 bed detached 2 storey dwellings. Development is to include connection to the existing access road across Cow Green which connects to R412, proposed internal roads and pathways, alterations to existing levels, site landscaping, boundary treatments, pedestrian access and all ancillary site development and excavation works
Notice-stated scale
57 units · 10,625 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0124512WW BCMS open-data feed
88 no. dwellings consisting of 8 no. 2 bed terraced bungalow dwellings, 10 no. 2 bed semidetached 2 storey dwellings, 4 no. 2 bed terraced 2 storey dwellings, 34 no. 3 bed semidetached 2 storey dwellings, 6 no. 3 bed terraced 2 storey dwellings, 13 no. 3 bed detached 2 storey dwellings. 8 no. 4 bed semidetached 2 storey dwellings & 6 no. 4 bed detached 2 storey dwellings. Development is to include connection to the existing access road across Cow Green which connects to R412, proposed internal roads and pathways, alterations to existing levels, site landscaping, boundary treatments, pedestrian access and all ancillary site development and excavation works
57 units · 6,731.5 m²Builder not named
30 Dec 2024
CN0113637WW BCMS open-data feed
88 no. dwellings consisting of 8 no. 2 bed terraced bungalow dwellings, 10 no. 2 bed semidetached 2 storey dwellings, 4 no. 2 bed terraced 2 storey dwellings, 34 no. 3 bed semidetached 2 storey dwellings, 6 no. 3 bed terraced 2 storey dwellings, 13 no. 3 bed detached 2 storey dwellings. 8 no. 4 bed semidetached 2 storey dwellings & 6 no. 4 bed detached 2 storey dwellings. Development is to include connection to the existing access road across Cow Green which connects to R412, proposed internal roads and pathways, alterations to existing levels, site landscaping, boundary treatments, pedestrian access and all ancillary site development and excavation works
31 units · 10,625 m²Builder not named
17 Apr 2024