Development Description
Retention Permission and Permission for the following; Retention Permission is sought to retain (a) an existing training pitch with ball stop netting (b) astro turf pitch with associated fencing (c) existing walking track (d) existing covered spectator stand (e) storage building (f) ticket booth building (g) score board structure (h) site boundaries. Permission is sought for (a) the installation of floodlighting to the existing training pitch and astro turf pitch complete with walking track lighting (b) the construction of a hurling wall (c) alterations to the existing site entrance gate, along with all other ancillary site works at