Commencement notice group

Housing commencement notices — Ballina

Ballina, Mayo

1 separate notice · latest notified commencement 11 Feb 2026 · planning reference supplied

Source notices
1
Latest notified commencement
11 Feb 2026
Latest notice
31 units
Planning references supplied
PT8MO237
Public location
Ballina, Mayo

Public source geography

Site location

Public site / locality
Ballina, Mayo
County
Mayo
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning referencePT8MO237

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0138720MO BCMS open-data feed

The proposed development will consist of 31 No. own-door-access apartments, comprising 3 No. Three-Bed units; 14 No Two-Bed units; 14 No One-Bed Units. The development will consist of 2 No. three-storey apartment blocks, 1 No. two-storey block and the refurbishment of the existing terrace at 5-7 Raheen Row. The scheme includes access from Kevin Barry Street and James Connolly Street.

31 units · 1,358 m² · stated on this notice

Planning reference PT8MO237

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.