Commencement notice group

Housing commencement notices — Hansfield

Hansfield, Dublin 15, Dublin

1 separate notice · latest notified commencement 16 Jun 2022 · planning reference supplied

Source notices
1
Latest notified commencement
16 Jun 2022
Latest notice
247 units
Planning references supplied
FW18A/0161
Public location
Hansfield, Dublin 15, Dublin

Public source geography

Site location

Public site / locality
Hansfield, Dublin 15, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning referenceFW18A/0161

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0090720FL BCMS open-data feed

The development will consist of the construction of 247 no. apartments in a building ranging from two to seven storeys in height consisting of 22 no. studio units, 48 no. one bed units, 164 no. two bed units, 12 no. two bed duplex units & 1 no. three bed unit. The building consists of 6 no. cores of apartments and 12 no. own door duplex units arranged around a communal courtyard area over a podium carpark. Core no’s 1 & 6 are seven storeys, core no’s 2, 4 & 5 are six storeys, core no. 3 is five storeys and the duplex units are two storeys. A total of 150 no. carparking spaces are to be provided in an undercroft carpark at ground floor level, together with bicycle parking spaces, plant and ancillary spaces with vehicular access from a new road to the north of the building. A further 122 no. carparking spaces are provided on surface in locations to the north, west and south of the building. A new public open space is to be provided to the east of the building adjacent to Hansfield train station. The works also include the construction of a foul pumping station, drainage works, and all site associated site, road and landscaping works on a 1.67 ha site located within Zone 7 of the Hansfield SDZ lands at Hansfield, Dublin 15. The development shall be handed over in 3 no. phases. The first phase will be for Cores 1, 6 and the undercroft car park. The second phase shall be for Cores 2 & 5. Then phase 3 shall be Cores 3 & 4. Escape routes and fire tender access shall be afforded throughout each phase to meet the requirements of Technical Guidance Document B. It is proposed to provide fire tender access to the undercroft car park during the first phase to ensure the required access is provided.

247 units · 21,447 m² · stated on this notice

Planning reference FW18A/0161

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.