Commencement notice group
Housing commencement notices — An Uaimh
An Uaimh, Meath
6 separate notices · latest notified commencement 08 Apr 2026 · planning reference supplied
- Source notices
- 6
- Latest notified commencement
- 08 Apr 2026
- Latest notice
- 82 homes
- Planning references supplied
- 25/60539
- Public location
- An Uaimh, Meath
Public source geography
Site location
- Public site / locality
- An Uaimh, Meath
- County
- Meath
Public site labels seen across the notices
- Navan, Meath
- No
- Athlumney, Navan, Co
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 82 No. 2 storey dwelling houses, at No. 75 - 156 Athlumney, Navan, Co. Meath.
82 homes · 8,693 m² · stated on this notice
Construction of 34 No. 2 storey dwelling houses, at No. 33 - 66 Athlumney, Navan, Co. Meath.
68 homes · 3,832 m² · stated on this notice
Construction of Duplex Block C, dwelling Nos. 29 - 32 at Athlumney, Navan, Co. Meath. This development consists of 4 No. duplex apartments in a single 3-storey block comprising 2 No. 1 bedroom, single storey apartments at ground floor, and 2 No. 2bedroom, two storey apartments above at first and second floor.
4 units · 310 m² · stated on this notice
Construction of 8 No. 2 storey dwelling houses, at No. 67 - 74 Athlumney, Navan, Co. Meath. .
68 homes · 834 m² · stated on this notice
Construction of Duplex Block B, dwelling Nos. 9 - 28 at Athlumney, Navan, Co. Meath. This development consists of 20 No. duplex apartments in a single 3-storey block comprising 4No. 1 bedroom and 6 No. 2 bedroom single storey apartments at ground floor, and 4 No. 2bedroom and 6 No. 3 bedroom 2 storey apartments above at first and second floor.
68 units · 1,798 m² · stated on this notice
Construction of Duplex Block A, dwellings Nos. 1 - 8 at Athlumney, Navan, Co. Meath. This development consists of 8 No. duplex apartments in a single 3-storey block comprising 4 No. 2 bedroom single storey apartments at ground floor, and 4 No. 3 bedroom 2 storey apartments above at first and second floor.
68 units · 806 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.