Commencement notice group
Commencement notices — Dublin
Dublin, Dublin
1 separate notice · latest notified commencement 12 Jan 2026 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 12 Jan 2026
- Latest notice
- 8,595 m²
- Planning references supplied
- 4561/23
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The demolition of the existing lift core, boiler chimney, machine room and storage compartments located at the front Northeast elevation of the property and the demolition of a second lift core, external machine room on the Southwest elevation. Both lift cores are to be replaced with new construction comprising of new larger lift cores to the same height as the existing passenger lifts. The Northeast passenger lift will comprise of a glazed elevation facing Herbert Road and aluminum cladding to the external walls. In addition, a revised ground floor level entrance to the proposed new lift only. The Southwest passenger lift will comprise of a new, larger lift core. The proposal includes associated internal modifications, elevation changes and all associated site development works above and below ground.
8,595 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.