Commencement notice group

Housing commencement notices — Mullagh

Mullagh, Cavan

1 separate notice · latest notified commencement 24 Feb 2026 · planning reference supplied

Source notices
1
Latest notified commencement
24 Feb 2026
Latest notice
13 homes
Planning references supplied
2560224
Public location
Mullagh, Cavan

Public source geography

Site location

Public site / locality
Mullagh, Cavan
County
Cavan
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference2560224

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0138986CN BCMS open-data feed

Construct 13 no dwellings, comprising of 8 no. two storey semi detached units, 1 no. two storey detached unit, 2 no. dormer style semi-detached units and 2 no. single storey semi detached units. -Reinforced concrete foundations -Concrete Block Construction -Prefabricated roof truss -All to be constructed to the current building regs.

13 homes · 1,518 m² · stated on this notice

Planning reference 2560224

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.