Commencement notice group

Housing commencement notices — Athy

Athy, Kildare

2 separate notices · latest notified commencement 22 Oct 2025 · planning reference supplied

Source notices
2
Latest notified commencement
22 Oct 2025
Latest notice
5 units
Planning references supplied
2585
Public location
Athy, Kildare

Public source geography

Site location

Public site / locality
Athy, Kildare
County
Kildare
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Kildare County Council · reference 2585 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference2585

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0013328KE BCMS open-data feed

CRECHE and apartment building at The Alder, Meadow Mill, Athy of:Phase 3 of a three phase housing development at Clonmullen & Gallowshill, Geraldine Road, Athy, Co. Kildare.

5 units · 945 m² · stated on this notice

Planning reference 2585
CN0133789KE BCMS open-data feed

Phase 3 (TYPE H - 4 DWELLINGS) of a three phase housing development to include erection of (a) 50 residential units comprising 2 no. two storey 100m2 3 bedroom semi-detached dwelling houses (House Type F),16 no. two storey 89.5m2 2 bedroom town houses (House Type G), 3 no. two storey apartment blocks (Block I) comprising 6 no. ground floor 73.93m2 2 bedroom apartments and 6 no. first floor 49.76m2 1 bedroom apartments, 5 no. three storey duplex blocks (Block H) comprising 10 no. ground floor 73.93m2 2 bedroom apartments and 10 no. 100m2 3 bedroom duplex apartments on first and second floors to include car parking, bin stores, bicycle stores and boundary wall, (b) new site entrance off Geraldine Road with access road, cycleway and footpath (c) provide vehicular and pedestrian access to adjoining site to south west comprising 0.8453 hectares currently zoned “C” New Residential (d) all site development works associated with main access road and phase 3 of the three phase residential development including footpaths, roads, public lighting, attenuation ponds, surface water drains, foul sewer drains, water mains and all other utility services necessary to service the proposed development at Clonmullen & Gallowshill,Geraldine Road,Athy,Co. Kildare.

4 units · 392 m² · stated on this notice

Planning reference 2585

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.