Commencement notice group
Housing commencement notices — Newcastle
Newcastle, Dublin
14 separate notices · latest notified commencement 12 Jul 2021 · planning reference supplied
- Source notices
- 14
- Latest notified commencement
- 12 Jul 2021
- Latest notice
- 48 units
- Planning references supplied
- 305343
- Public location
- Newcastle, Dublin
Public source geography
Site location
- Public site / locality
- Newcastle, Dublin
- County
- Dublin
Public site labels seen across the notices
- Newcastle South and Ballynakelly, Newcastle, County Dublin
- first floor consisting of 4no 2 storey timber frame Duplex units over 4no ground floor masonry constructed apartments
- first floor consisting of 6no 2 storey timber frame Duplex units over 6no ground floor masonry constructed apartments
- first floor consisting of 8no 2 storey timber frame Duplex units over 8no ground floor masonry constructed apartments
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official source may currently be unavailable; the link and planning reference remain available below.
-
Official planning file Application details, decision and available documents South Dublin County Council · reference SHD3ABP-305343-19 Official council planning portal Official link · source may currently be unavailable Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 6 - The construction of 48 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
48 units · 5,744 m² · stated on this notice
Erection of a 5/3 storey traditional built stepped multi unit with balconies & terraces, comprising of 26 residential apartment units, 1 ground floor commercial unit and 24 Duplex/Apartment units and associated site works, surface car parking, including a new site entrance to the development. 1 Building
50 units · 5,146 m² · stated on this notice
Erection of one 3 storey multi unit block with terraces at first floor consisting of 4no 2 storey timber frame Duplex units over 4no ground floor masonry constructed apartments.
8 units · 845 m² · stated on this notice
Erection of one 3 storey multi unit block with terraces at first floor consisting of 6no 2 storey timber frame Duplex units over 6no ground floor masonry constructed apartments.
12 units · 1,261 m² · stated on this notice
Erection of one 3 storey multi unit block with terraces at first floor consisting of 8no 2 storey timber frame Duplex units over 8no ground floor masonry constructed apartments.
16 units · 1,677 m² · stated on this notice
Phase 5a - The construction of 7 two storey timber frame residential units, comprising of 2 terraced units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
122 units · 817 m² · stated on this notice
Phase 5 - The construction of 31 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
31 units · 3,660 m² · stated on this notice
Phase 4 - The construction of 65 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.
65 units · 7,522 m² · stated on this notice
Sub-division of existing two storey commercial building into 3 apartments (C3) at 32 Ballynakelly Edge, Newcastle, Co. Dublin.
3 units · 232 m² · stated on this notice
Phase 3, involving the construction of 1 Block of 16 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin
16 units · 1,777 m² · stated on this notice
Phase 3, involving the construction of 1 Block of 12 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin
12 units · 1,334 m² · stated on this notice
Phase 3, involving the construction of 1 Block of 8 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin
8 units · 884 m² · stated on this notice
Phase 2, involving the construction of 53 houses of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin
53 homes · 5,982 m² · stated on this notice
Phase 1, involving the construction of 51 houses of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works.
51 homes · 6,367 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.