Commencement notice group

Building extension commencement notices — Rush

Rush, Dublin

1 separate notice · latest notified commencement 01 Oct 2025 · planning reference supplied

Source notices
1
Latest notified commencement
01 Oct 2025
Latest notice
9,000 m²
Planning references supplied
F24A/1192E
Public location
Rush, Dublin

Public source geography

Site location

Public site / locality
Rush, Dublin
County
Dublin

Public site labels seen across the notices

  • Morning Fresh Farm ltd
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceF24A/1192E

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0134142FL BCMS owner-supplied export

Construction of Extension to Existing Glasshouse Facility; demolition of 9000sq.m existing glasshouse facility at Morning Fresh Farm ltd., Rush Demesne, Rush, Co. Dublin

9,000 m² · stated on this notice

Planning reference F24A/1192E Builder stated: Ammerlaan Construction B.v.

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.