1 separate notice · latest notified commencement 22 Jun 2026 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 22 Jun 2026
- Latest notice
- 117 m²
- Planning references supplied
- 23/262
- Public location
- Bray, Wicklow
Public source geography
Site location
- Public site / locality
- Bray, Wicklow
- County
- Wicklow
Public site labels seen across the notices
- ESB 38 kV substation, Herbert Road, Bray Co
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not indexed a direct drawings link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Installation of Modular structures on raised platforms consisting of: 38 kV GIS module (c. 31 sqm and c. 5.2 m high), control room (c. 32 sqm and 4.7 m high), internal access road and all associated site works including surface water drainage and underground electrical cable works at ESB 38 kV substation, Herbert Road, Bray Co. Wicklow.
117 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.