Commencement notice group
Building extension commencement notices — Carrownaff
Carrownaff, Moville, Donegal
2 separate notices · latest notified commencement 19 Mar 2026 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 19 Mar 2026
- Latest notice
- 63 m²
- Planning references supplied
- 20/50601
- Public location
- Carrownaff, Moville, Donegal
Public source geography
Site location
- Public site / locality
- Carrownaff, Moville, Donegal
- County
- Donegal
Public site labels seen across the notices
- Moville, Donegal
- Moville Community College (63sqm)
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Donegal County Council · reference 20/50601 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Erection of a replacement grounds maintenance store at Moville Community College (63sqm).
63 m² · stated on this notice
The development will consist of: (i) Removal of all existing temporary school buildings, including foundations and demolition of any related elements (ii) Construction of a new permanent 2-storey Post Primary School Building for Moville Community College (5,222 sq. m gross floor area) with associated external signage. The constituent elements of the New School Building comprise: (a) 10 no. general classrooms, 8 no. specialist teaching rooms, 2 no. special needs classrooms within a Special Educational Needs Suite, PE Hall and associated PE ancillary accommodation, staff room, administration rooms, toilets, stores and a double height General Purpose Room with associated kitchen and store (b) an enclosed first floor link corridor to the existing 2-storey School Building (iii) External Covered Area and external Construction Studies Store (iv) Site development works including revisions to vehicular / pedestrian parking with new bus drop-off zones including 54 no. additional standard car parking spaces, 5 no. universally accessible parking spaces and 4 no. bus spaces (v) a temporary / emergency vehicular access onto the northern boundary (iv) 3 no. additional ball courts. The proposed development also includes diversion of existing ESB power lines and storm drainage, provision of storm attenuation, a new waste water treatment plant, hard and soft landscaping, grassed play space, outer activity court, SEN garden / play space, associated site development and service infrastructure works.
15,666 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.