Commencement notice group

Housing commencement notices — Ashford

Ashford, Wicklow

1 separate notice · latest notified commencement 01 Jun 2026 · planning reference supplied

Source notices
1
Latest notified commencement
01 Jun 2026
Latest notice
1 home
Planning references supplied
25/60685
Public location
Ashford, Wicklow

Public source geography

Site location

Public site / locality
Ashford, Wicklow
County
Wicklow
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not indexed a direct drawings link.

Planning reference25/60685

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0143555WW BCMS owner-supplied export

The construction of a dwelling, a new site entrance and access laneway, relocation of agricultural entrance, new effluent treatment system all together with associated site works as per granted planning application under plan reg. ref. 25/60685 and 21/1496 / An Bord Pleanala Ref. No. 314486-22

1 home · 165 m² · stated on this notice

Planning reference 25/60685 Builder stated: Kilpoole Developments

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.