Commencement notice group

Housing commencement notices — Mitchelstown

Mitchelstown, Cork

3 separate notices · latest notified commencement 23 Mar 2026 · planning reference supplied

Source notices
3
Latest notified commencement
23 Mar 2026
Latest notice
48 units
Planning references supplied
22/04751
Public location
Mitchelstown, Cork

Public source geography

Site location

Public site / locality
Mitchelstown, Cork
County
Cork
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference22/04751

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0139725CC BCMS owner-supplied export

Páirc an Chaisleáin - The construction of 48 no. residential units (1-48) and all other ancillary works.

48 units · 3,900 m² · stated on this notice

Planning reference 22/04751 Builder stated: CCM Smarthome Developments Ltd Developer stated: CCM Smarthome Developments Ltd
NBCO:CN0120583CC NBCO historical file

The demolition of the former Mart Complex buildings/sheds and existing entrance walls and gate and the construction of 51 no. residential housing units consisting of 12 no. 2 bed ground floor apartments, 12 no 3 bed duplex apartments, 19 no 3 bed 2 storey houses and 8 no 3 bed 2 storey and all other ancillary works.

50 units · 305 m² · stated on this notice

Planning reference 22/04751
CN0120583CC BCMS owner-supplied export

The demolition of the former Mart Complex buildings/sheds and existing entrance walls and gate and the construction of 51 no. residential housing units consisting of 12 no. 2 bed ground floor apartments, 12 no 3 bed duplex apartments, 19 no 3 bed 2 storey houses and 8 no 3 bed 2 storey and all other ancillary works.

51 units · 2,871 m² · stated on this notice

Planning reference 22/04751 Builder stated: CCM Smarthome Developments Ltd Developer stated: CCM Smarthome Developments Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.