Citywest Village — commencement notices
Dublin, Dublin
10 separate notices · latest notified commencement 17 Feb 2020 · planning reference supplied
- Source notices
- 10
- Latest notified commencement
- 17 Feb 2020
- Latest notice
- 36 units
- Planning references supplied
- SD15A/0127
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Citywest Village, Dublin
- Citywest, Dublin
- Citywest Village, Fortunestown Lane, Dublin 24
- nos
- Citywest Village Phase 5, the construction of 33 houses and associated site works
- Citywest Village Phase 4, the construction of 23 houses and associated site works
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official source may currently be unavailable; the link and planning reference remain available below.
-
Official planning file Application details, decision and available documents South Dublin County Council · reference SD15A/0127 Official council planning portal Official link · source may currently be unavailable Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
This application is for construction of a new residential development (Block E) at Citywest Village, Fortunestown Lane, Dublin 24. The residential development consists of a six-storey apartment block with 36 apartments: • Ground, First, Second and Third Floor: 7 units with 6 no. two bedroom apartments and 1 no. one bedroom apartment. • Fourth Floor: 6 units with 5 no. two bedroom apartments and 1 no. one bedroom apartments. • Fifth Floor: 2 units with 2 no. two bedroom apartments. There is also access to a Communal Roof Terrace at this level.
36 units · 119,088 m² · stated on this notice
At 1-6 The Lawn, 1-8 The Grove, 1-20 & 22-32(even) The Crescent, 1-18 & 20-52(even) The Park & 1-20 The Walk, Citywest Village, the construction of 95 no. 2-storey houses of masonry construction with slated pitched roofs and concrete ground floors.
95 homes · 10,545 m² · stated on this notice
At nos. 3-17 (incl.) & 19 & 21 The Hill and 11-19 (incl.) The View (Citywest Village Phase 8), the construction of 26 no. 2-storey houses. All the houses are of masonry construction with concrete ground floors and slated pitched roofs.
58 homes · 2,886 m² · stated on this notice
At nos. 1-4 (incl.) The Court, 3-15 (incl.) The Place, 3-15 (incl.) The Rise (Citywest Village Phase 7), the construction of 30 houses and associated site works. All of the houses are two storey and of masonry construction with slated pitched roofs and concrete ground floors.
30 homes · stated on this notice
At nos. 2-10 (incl.) The View, 3-16 (incl.) & 18 & 20 The Dale and 18 The Hill (Citywest Village Phase 6), the construction of 26 houses and associated site works. All of the houses are two storey and of masonry construction with slated pitched roofs and concrete ground floors.
26 homes · stated on this notice
At Citywest Village Phase 5, the construction of 33 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
33 homes · stated on this notice
At Citywest Village Phase 4, the construction of 23 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
23 homes · stated on this notice
Construction of 17 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
17 homes · stated on this notice
Construction of 22 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
22 homes · stated on this notice
The construction of 15 no. houses (units 210-213 & 228-238) and associated siteworks. All the houses are two-storey and of masonry construction with tiled pitched roofs and concrete ground floors.
15 homes · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.