Dublin, Dublin
2 separate notices · latest notified commencement 08 Oct 2025 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 08 Oct 2025
- Latest notice
- 15,246 m²
- Planning references supplied
- TA0001
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin 4, Dublin
- University College Dublin, Stillorgan Road, Belfield, Dublin 4
- University College Dublin, Belfield, Dublin 4
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Block A Student Accommodation situated over basement level at University College Dublin, Stillorgan Road, Belfield, Dublin 4.
15,246 m² · stated on this notice
Construction of a single storey extension to existing ESB sub-station comprising additional ESB Sub- station including two LV Switch Rooms, Life Safety Generator Room and two open air bin stores with associated site works at University College Dublin, Belfield, Dublin 4
78 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.