7 separate notices · latest notified commencement 08 Jul 2022 · planning reference supplied
- Source notices
- 7
- Latest notified commencement
- 08 Jul 2022
- Latest notice
- 17 units
- Planning references supplied
- DZ20A/0552
- Public location
- Cherrywood, Dublin 18, Dublin
Public source geography
Site location
- Public site / locality
- Cherrywood, Dublin 18, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin, Dublin
- Dublin 18, Dublin
- Cherrywood, Dublin
- Cherrywood, Dublin 18
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
T8 (Duplexes), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of 17 No. residential duplex units in 1 No. 2-3 storey block including associated site development works.
17 units · 2,470 m² · stated on this notice
T6 (Houses), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of 66 No. new detached, semi-detached and terraced houses including associated site development works.
66 homes · 8,646 m² · stated on this notice
T8 (Houses), Cherrywood Village, Cherrywood, Dublin 18 comprising the construction of 13 No. new semi- detached and terraced houses including associated site development works.
13 homes · 1,147 m² · stated on this notice
Cherrywood L1 L2 Enabling works, comprising of cut and fill of soil and removal and disposal off site at Cherrywood, Dublin 18.
1 unit · 17,645 m² · stated on this notice
T8 Cherrywood Enabling Works, Cherrywood, Dublin 18 comprising substantial strip of existing topsoil; substantial cut-and- fill of soil as a result of the existing ground level profile / contours; soil stabilisation works; existing tree root protection; and associated ancillary works.
6,050 m² · stated on this notice
T6 Cherrywood Enabling Works, Cherrywood, Dublin 18 comprising substantial strip of existing topsoil; substantial cut-and-fill of soil as a result of the existing ground level profile / contours; soil stabilisation works; provision of a temporary surface water headwall and pipe; and associated ancillary works.
26,169 m² · stated on this notice
T6 Showcourt, Cherrywood Village, Cherrywood, Co. Dublin comprising the construction of 8 No. 3-storey dwellings including associated site development works.
8 homes · 1,052 m² · stated on this notice