Commencement notice group

Housing commencement notices — Dublin

Dublin 12, Dublin

1 unique commencement event · latest notified commencement 03 May 2022 · planning reference supplied

Unique commencement events
1
Latest notified commencement
03 May 2022
Latest notice
249 units
Planning references supplied
ABP-311606-21
Public location
Dublin 12, Dublin

Public source geography

Site location

Public site / locality
Dublin 12, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-311606-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0007165DC BCMS open-data feed

Proposed revisions to previously approved Fire Safety Certificate (reg no FA/18/1225). This residential development of 249 apartments in 8 blocks ranging from 5 to 8 storey over Lower Ground Floor Carpark. The total area of the development is 32,473.6m2. It is intended to carry out the works in 3 phases as set out in the Fire cert report. The ancillary spaces, including meeting room, community facility, café and digital hub are being constructed to shell and core standard and will be subject to a further commencement notice.

Work stated for this notice 249 units Explicit phase quantity stated by the source.

Floor area stated for this source: 32,474 m².

Appeal reference ABP-311606-21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.