Commencement notice group

Housing commencement notices — Malahide

Malahide, Dublin

1 separate notice · latest notified commencement 11 Mar 2026 · planning references supplied

Source notices
1
Latest notified commencement
11 Mar 2026
Latest notice
14 units
Planning references supplied
F22A/0652 · ABP-317192-23
Public location
Malahide, Dublin

Public source geography

Site location

Public site / locality
Malahide, Dublin
County
Dublin

Public site labels seen across the notices

  • Wycliffe, Millview Road, Malahide, County Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning referenceF22A/0652
Appeal referenceABP-317192-23

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0013874FL BCMS open-data feed

Demolition of existing bungalow and construction of 3 storey apartment building over basement comprising 14no. residential units at Wycliffe, Millview Road, Malahide, County Dublin.

14 units · 1,879 m² · stated on this notice

Planning reference F22A/0652 Appeal reference ABP-317192-23

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.