Commencement notice group
Housing commencement notices — Naas
Naas, Kildare
2 unique commencement events · latest notified commencement 20 Nov 2018 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 20 Nov 2018
- Latest notice
- 58 houses
- Planning references supplied
- 16/1117
- Public location
- Naas, Kildare
Public source geography
Site location
- Public site / locality
- Naas, Kildare
- County
- Kildare
Public site labels seen across the notices
- Craddockstown, Naas, Co
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
58 units (Phase 2) of Residential development comprising 251 permitted two & three storey semi-detached/terraced dwellings, two storey creche and all associated site development works permitted under reg. ref. 16/1117(ABP PL09.249006) at Craddockstown, Naas, Co. Kildare.
Floor area stated for this source: 7,716 m².
90 units (Phase 1) of Residential development comprising 251 permitted two & three storey semi-detached/terraced dwellings, two storey creche and all associated site development works permitted under reg. ref. 16/1117(ABP PL09.249006) at Craddockstown, Naas, Co. Kildare.
Floor area stated for this source: 11,484 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.