Commencement notice group

Housing commencement notices — Ballsbridge

Ballsbridge, Dublin

1 unique commencement event · latest notified commencement 18 May 2026 · planning basis not stated

Unique commencement events
1
Latest notified commencement
18 May 2026
Latest notice
407 m²
Planning references supplied
None stated
Public location
Ballsbridge, Dublin

Public source geography

Site location

Public site / locality
Ballsbridge, Dublin
County
Dublin

Public site labels seen across the notices

  • the second floor level and demolition of non-original boiler house
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0142265DC BCMS open-data feed

for internal works, single storey rear and storey side extensions, rear facing window at the second floor level and demolition of non-original boiler house. Repointing of the brick facade to the front. The proposal includes for provision of hard and soft landscaping and all other associated site works and services.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 407 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.