Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
1 unique commencement event · latest notified commencement 25 Jun 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 25 Jun 2026
- Latest notice
- 1 house
- Planning references supplied
- D25B/0516/WEB
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- 1st floor level on the side gable wall to the existing stairwell, and all associated development works
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Construction of a new 30.76 sq.m. 1-storey extension to the rear, 2. Construction of a new 34.67 sq.m. 1-storey extension to the side & front of the existing house, with an array of photovoltaic panels to be situated behind the parapet wall to the flat roof 3. Formation of a new window opening at 1st floor level on the side gable wall to the existing stairwell, and all associated development works.
Floor area stated for this source: 66 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.