Commencement notice group
Housing commencement notices — Claregalway
Claregalway, Galway
3 separate notices · latest notified commencement 29 May 2024 · planning reference supplied
- Source notices
- 3
- Latest notified commencement
- 29 May 2024
- Latest notice
- 295 m²
- Planning references supplied
- ABP-312191-21
- Public location
- Claregalway, Galway
Public source geography
Site location
- Public site / locality
- Claregalway, Galway
- County
- Galway
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Comprising of creche. Phase 4 of 4. Note: Phase 01 - Houses Phase 02 Apartment Block 01 Phase 03 Apartment Block 02 Phase 04 Creche
295 m² · stated on this notice
Comprising of apartment units. Phase 02 & 03 of 4. Note: Phase 01 -Garraí Na Gaoithe Houses Phase 02 Cluain Chláir Apartment Block 01 Phase 03 Droim An Gharraí Apartment Block 02 Phase 04 Creche
38 units · 3,577 m² · stated on this notice
Construction of 73 houses mixed with detached, terraced and semi detached houses. Phase 01 of 4. Note: Phase 01 - 73 Houses Phase 02 Apartment Block 01 Phase 03 Apartment Block 02 Phase 04 Creche
73 units · 85,685 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.