Commencement notice group
Housing commencement notices — Carlow
Carlow, Carlow
3 unique commencement events · latest notified commencement 04 Feb 2020 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 04 Feb 2020
- Latest notice
- 12 houses
- Planning references supplied
- 16/353
- Public location
- Carlow, Carlow
Public source geography
Site location
- Public site / locality
- Carlow, Carlow
- County
- Carlow
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 12 no. dwellings in 3 No. two storey blocks site no. 9 - 20 inculsive, Maple Park, Rivercourt, O'Brien Rd, Carlow.
Floor area stated for this source: 1,114 m².
Construction of 8 No. dwellings in 4 No. two storey blocks on site 1 to 8 inclusive, Maple Park and all site development works including surface water and foul water drainage, roads, footpaths, public open space.
Floor area stated for this source: 832 m².
Construction of 8 no dwellings in 2 no two storey blocks on site no. 11 to 18 inclusive, Maple Road and all site development works including surface water and foul water drainage, roads, footpaths, public open space.
Floor area stated for this source: 696 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.