Commencement notice group

Housing commencement notices — Cavan

Cavan, Cavan

1 separate notice · latest notified commencement 06 Feb 2026 · planning references supplied

Source notices
1
Latest notified commencement
06 Feb 2026
Latest notice
51 homes
Planning references supplied
2560057 · 322498
Public location
Cavan, Cavan

Public source geography

Site location

Public site / locality
Cavan, Cavan
County
Cavan

Public site labels seen across the notices

  • development known as Gort Na Carraige, Billis and Drumalee,Cootehill Road, Co
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference2560057
Planning reference322498

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0138359CN BCMS owner-supplied export

Construction of 51 Dwelling Houses (plots 1-30 & 71-91) as part of Phase 1 at development known as Gort Na Carraige, Billis and Drumalee,Cootehill Road, Co. Cavan

51 homes · 4,633 m² · stated on this notice

Planning reference 2560057 Planning reference 322498

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.