Commencement notice group

Housing commencement notices — Droichead na Bandan

Droichead na Bandan, Cork

2 separate notices · latest notified commencement 20 Feb 2026 · planning reference supplied

Source notices
2
Latest notified commencement
20 Feb 2026
Latest notice
418 m²
Planning references supplied
23/4231
Public location
Droichead na Bandan, Cork

Public source geography

Site location

Public site / locality
Droichead na Bandan, Cork
County
Cork

Public site labels seen across the notices

  • Bandon, Cork

Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference23/4231

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0126384CC BCMS owner-supplied export

The Tannery, Bandon, Cork: The construction of 3no. dwelling houses which comprise of 2no. 3 bedroom and 1 no. 2 bedroom townhouse and all ancillary site works, Nos 1-3.

3 homes · 191 m² · stated on this notice

Planning reference 23/4231 Builder stated: JOD Developments LTD. Developer stated: JOD Developments LTD

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.