Commencement notice group

Housing commencement notices — Dublin

Dublin 6, Dublin

1 separate notice · latest notified commencement 09 Jun 2026 · planning reference supplied

Source notices
1
Latest notified commencement
09 Jun 2026
Latest notice
2 units
Planning references supplied
3898/15/X1
Public location
Dublin 6, Dublin

Public source geography

Site location

Public site / locality
Dublin 6, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference3898/15/X1

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0014266DC BCMS open-data feed

Four-storey mixed-use building providing office accommodation at lower ground floor level and two multilevel residential apartment units at upper ground to second floor levels, with independent access arrangements, landscaped entrance court and stepped pedestrian access, adjoining the River Dodder and existing buildings.

2 units · 335 m² · stated on this notice

Planning reference 3898/15/X1

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.