Commencement notice group
Housing commencement notices — Atane
Atane, Dublin
1 unique commencement event · latest notified commencement 16 Sep 2025 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 16 Sep 2025
- Latest notice
- 2 houses
- Planning references supplied
- None stated
- Public location
- Atane, Dublin
Public source geography
Site location
- Public site / locality
- Atane, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The development consists of the (1) Demolition of existing single storey porch to the front, single storey utility room to side and single storey coal house to the rear of existing house. (2) Construction of a single storey extension to the front and rear of existing house and for the construction of a 2 storey extension to the side of existing house. (3) Conversion of existing attic space to storage room (4) The subdivision of the proposed development (including new side extension) will create 1no 2 storey 2-bedroom house to the side of existing house. (5) and for 2 vehicular accesses exiting onto McAuley Road. (6) this application seeks permission for all associated site works.
Floor area stated for this source: 158 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.