Commencement notice group
Commercial commencement notices — Drumshanbo
Drumshanbo, Leitrim
1 unique commencement event · latest notified commencement 14 Apr 2026 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 14 Apr 2026
- Latest notice
- 1,156 m²
- Planning references supplied
- None stated
- Public location
- Drumshanbo, Leitrim
Public source geography
Site location
- Public site / locality
- Drumshanbo, Leitrim
- County
- Leitrim
Public site labels seen across the notices
- Drumshanbo, Co
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
4-Strand Rural Regeneration at Drumshanbo, Co. Leitrim (Works Title - Drumshanbo ExCHANGE). The works will include the following: Redevelopment and extension of two vacant buildings on Main Street: Namely the former Bank of Ireland, a three-storey building (Referred to as 'Building 01'), and the adjacent commercial building formerly known as ‘Earley’s’, a three-storey building (Referred to as 'Building 02'). Development works will include the demolition of the rear extensions to the respective buildings and the erection of a linear two-storey extension to the south side linking both buildings to provide commercial use to the entire ground floor and new smart working facility to the entire first and second floors. Works will include the creation of a new pedestrian walkway on the ground floor through ‘Earley’s’ building to link a new public realm to the rear. All services will connect to existing public mains. Construction of a public realm and additional parking to the rear of these buildings: The nature of the public realm works includes, inter alia, the opening of vehicular and pedestrian access routes through the existing stone boundary wall between the existing Market Street carpark and the former Bank of Ireland Building, lowering the height of the entire wall to 1m high, realignment works to the existing Market Street Carpark, the provision of new public lighting, a dedicated pedestrianized public realm that will incorporate seating, the provision of hard and soft landscaping, ramp access between Main Street and the redeveloped riverside walkway and a car park for seven car parking spaces Redevelopment and reconstruction of two derelict outbuildings: Building 03 and 04 are to the east of the Drumshanbo River. Both two-storey buildings will be redeveloped and repurposed to provide commercial use on both ground and first floors respectively, which will entail elevational changes and connections to existing foul and storm mains. Riverside and Town Park Improvemen
Floor area stated for this source: 1,156 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.