Commencement notice group
Housing commencement notices — Malahide
Malahide, Dublin
1 separate notice · latest notified commencement 26 Nov 2025 · planning references supplied
- Source notices
- 1
- Latest notified commencement
- 26 Nov 2025
- Latest notice
- 52 homes
- Planning references supplied
- 318393 · F23A/0492
- Public location
- Malahide, Dublin
Public source geography
Site location
- Public site / locality
- Malahide, Dublin
- County
- Dublin
Public site labels seen across the notices
- Lands at Mabestown, Malahide Road (R107), Malahide, Co
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a residential development of 2-3 storey houses consisting of 52 no. units (7 no. 2 beds, 31 no. 3 beds, 8 no. 4 beds and 6 no. 5 beds) within terraced and semi- detached arrangements at Lands at Mabestown, Malahide Road (R107), Malahide, Co. Dublin. The works include car and cycle parking, new residential streets, open spaces, play area, and provision of new site entrance from the R107. All associated site development works, landscaping, boundary treatments, and services provision.
52 homes · 6,223 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.